My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8 PCSR 02-22-1994
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1994
>
02-22-1994
>
8 PCSR 02-22-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2018 8:30:34 AM
Creation date
4/2/2018 1:25:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• MEMORANDUM <br /> TO: PLANNING COMMISSION <br /> CITY COUNCIL <br /> FROM: PARK& RECREATION COMMISSION <br /> DATE: FEBRUARY 17, 1994 <br /> SUBJECT: COUNTRY CROSSING PLAT <br /> The Park and Recreation Commission reviewed the Country Crossing preliminary plat at <br /> their regular meeting on 2/9/94. The Commission spent a good deal of time discussing <br /> the needs for a pedestrian trail in this area. The primary need in to connect a trail from <br /> Orono Parkway to the trail that separates Mississippi Oaks and Heritage Landing, south <br /> of County Road 30. <br /> The Commission considered four options: <br /> • 1. Paint stripe a path between the curb line and the traffic line on Fresno Street. <br /> 2. Widen Gary Street and paint stripe a path between the curb line and the traffic line <br /> on Gary Street. <br /> 3. Widen the right-of-way on Gary Street and place the trail behind the curb with a <br /> five foot boulevard along Gary Street. <br /> 4. Create a twenty foot wide outlot along the eastern plat boundary, placing trail in <br /> the back yards of the homes facing Fresno Street and Gary Street. <br /> The Park and Recreation Commission passed a motion (6-0) to recommend Option #4 to <br /> the City Council, including trail connections on the lot lines between Lots 7 & 8 and Lots <br /> 18 & 19 from Gary Street to the north/south trail corridors. <br /> A second motion was passed(6-0)to calculate the property dedicated to trail use and give <br /> the developer credit toward the required Park Dedication Fee, with the remaining Park <br /> Dedication Fee to be accepted in cash. <br />
The URL can be used to link to this page
Your browser does not support the video tag.