Laserfiche WebLink
Paul Krause, CUP Page 2 <br /> December 28, 1993 <br /> • The existing parking lot for the golf course is currently <br /> unimproved and does not meet City code. Staff recommends Mr. <br /> Krause bring the existing parking lot up to City standards over <br /> the next 3 years . This would include bituminous surfacing, <br /> striping, and meeting the required 10 foot parking lot setback <br /> from property lines . <br /> ZONING <br /> The zoning of this parcel is Rlc to the south and PUD to the <br /> north. Normally, zoning district boundaries fall on existing <br /> lot lines however, this parcel is split by two different zoning <br /> districts . The Rlc zoning district allows golf courses as a <br /> conditional use. Since the driving range is considered a <br /> temporary use, it is staff ' s interpretation that this use could <br /> fall under the Rlc parameters until this area is developed. <br /> Staff is recommending this conditional use permit be reviewed <br /> on a 2 year basis to ensure that this land use is compatible <br /> with the comprehensive plan and development within the area at <br /> the time of review. <br /> LANDSCAPING <br /> Since the driving range is scheduled to be a temporary use, it <br /> is staff ' s interpretation that the landscaping ordinance can be <br /> • waived. Landscaping will be addressed once this site is <br /> permanently developed. <br /> RECOMMENDATION <br /> Staff is recommending approval of the conditional use permit <br /> request by Paul Krause for a temporary golf driving range with <br /> the following conditions : <br /> 1 . THE DRIVING RANGE BE LIMITED TO 15 TEE STALLS, UNLESS <br /> ADDITIONAL PARKING IS PROVIDED. <br /> 2 . HOURS OF THE DRIVING RANGE BE CONSISTENT WITH THAT OF <br /> THE GOLF COURSE . <br /> 3 . THE EXISTING PARKING LOT OF THE GOLF COURSE BE <br /> UPGRADED TO MEET EXISTING CODE REQUIREMENTS <br /> (BITUMINOUS SURFACING, STRIPING, SETBACKS) WITHIN A <br /> THREE YEAR TIME PERIOD. A PLAN SHALL BE SUBMITTED TO <br /> THE CITY ILLUSTRATING THE THREE PHASES OF IMPROVEMENT <br /> AND WHEN THOSE WILL BE COMPLETED. <br /> 4 . THIS USE BE REVIEWED ON A TWO YEAR BASIS TO ENSURE <br /> COMPATIBILITY WITH THE COMPREHENSIVE PLAN AND <br /> SURROUNDING DEVELOPMENT ACTIVITY. <br /> • <br />