My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6 PCSR 12-28-1993
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1993
>
12-28-1993
>
6 PCSR 12-28-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2018 9:21:31 AM
Creation date
4/2/2018 12:41:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 . Building construction, driveways, parking, grading, <br /> • utilities, surface water management, erosion control, <br /> landscaping, fencing, and screening for the Facility <br /> shall be provided substantially in accordance with the <br /> plans submitted by the Permittee and hereby made a <br /> part of this Permit. <br /> 3 . All utility and street construction plans and <br /> specifications as presented by the Permittee for the <br /> Facility and servicing streets must be prepared by a <br /> Registered Civil Engineer in accordance with <br /> directions of and as approved by the City Engineer. <br /> 4 . All building plans and specifications must be approved <br /> by the City Building Inspector and Fire Chief . <br /> 5 . Approval of driveway entrances or exits, if needed, on <br /> State and County highways shall be secured from the <br /> appropriate agencies and filed with the City Zoning <br /> Administrator prior to issuance of any building <br /> permit. <br /> 6 . The City shall have the right of access to the <br /> Facility and site. The City need not give prior <br /> notice to the Permittee for designated personnel to <br /> access the Facility or site during the hours of <br /> • 6 : 00 a.m. to 6 : 00 p.m. , Monday through Saturday, or if <br /> any emergency occurs. At any other time, at least <br /> twelve (12) hours prior notice to the Permittee is <br /> required. Such access shall be in accordance with the <br /> Permittee ' s safety standards and proprietary <br /> information requirements, and shall not interfere with <br /> the Permittee ' s ability to perform its contractual <br /> obligations . <br /> 7 . All employee or visitor motor vehicles associated with <br /> Facility operation shall be parked on Facility <br /> property or on adjacent property owned by the <br /> Permittee, but not on adjacent lands not owned by <br /> Permittee or on adjacent streets . Adequate facilities <br /> must be provided to ensure that no vehicle delivering <br /> RDF to 'the Facility will have to wait outside the <br /> perimeter of the Facility site. <br /> 8 . The City shall be notified by the Permittee <br /> immediately upon the release or spill of hazardous <br /> materials at the Facility; and of any violations of <br /> the conditions of the Permit, Air Emission Facility <br /> Permit No. 147A-86-OT- 1, or Permit for a Waste <br /> Processing Facility and System, No. SW-305 . <br /> 9 . This Permit authorizes burning at the Facility of up <br /> to 1, 050 tons per day of RDF as a monthly average . <br /> 2 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.