My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5 PCSR 12-28-1993
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1993
>
12-28-1993
>
5 PCSR 12-28-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2018 9:21:34 AM
Creation date
4/2/2018 12:38:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12/22/93 10:23 12612 559 2202 B.A. LIESCH Z002/003 <br /> • <br /> LIEXH <br /> - B.A. LIESCH ASSOCIATES,INC, 13400 15TH AVE.N. MINNEAPOLIS, MN 55441 612/559-1423 FAX;612/559-2202 <br /> MEMORANDUM <br /> TO: STEVEN ROHLF - CITY OF ELK RIVER <br /> FROM: JOHN LICHTER - B.A. LIESCH ASSOCIATES <br /> DATE: DECEMBER 22, 1993 <br /> RE: RENEWAL OF NRG CONDITIONAL USE PERMIT <br /> Based on our recent telephone conversations, I have reviewed several issues in regard to <br /> the Conditional Use Permit (CUP) renewal request forwarded by NRG. At this time, I <br /> have not received all information that has been requested from NRG, however, based on <br /> • our discussions, I believe the information they submit will not impact the findings of this <br /> memorandum. I had conversations with Mr. Joseph Weinhold of NRG concerning <br /> environmental issues at the NRG facility. <br /> I have confirmed the following issues with Mr. Weinhold: <br /> 1. The Fen wall system has been switched from halon to a sodium bicarbonate system <br /> thus eliminating the discharge of CFCs from the halon system. <br /> 2. Mr. Weinhold indicated that their water supply testing in the plant exceeded MDH <br /> EPA standards for copper in the softened water supply based on two samples taken <br /> in the janitor's sink and the bathroom sink. It is anticipated by Mr. Weinhold that <br /> these levels may fall within drinking water standards in the unsoftened drinking <br /> water source. Samples confirming test results from the drinking water sources will <br /> be collected in January and analyzed shortly thereafter. <br /> 3. The metals levels present in run-off water on-site has been below the drinking <br /> water standard dr RAL for lead and cadmium, the two metals that we have been <br /> analyzing in surface water run-off on the facility. <br /> 01 Based on my conversations with you and Mr. Weinhold, it is not likely that NSP has <br /> exceeded the tonnage requirement of 1526 tons per day on an average annual through-put <br /> basis in their existing permit and license from the City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.