My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 PCSR 06-10-1993
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1993
>
06-10-1993
>
3 PCSR 06-10-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2018 10:35:34 AM
Creation date
4/2/2018 10:35:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk Park Center Project Page 2 <br /> June 4 , 1993 <br /> • PLANNING COMMISSION CONSIDERATION <br /> The Planning Commission will be reviewing the preliminary plat <br /> of Elk Park Center, a conditional use permit for the <br /> development of the PUD, and a zone change for the property in <br /> the southwest corner of the proposed project. Staff will <br /> prepare a separate memo on the zone change request. <br /> PAST MATERIALS SUPPLIED <br /> The Planning Commission has been supplied with a site plan, <br /> building elevations for the major tenants, a landscaping plan, <br /> a proposed preliminary plat, a grading and drainage plan, a <br /> site lighting plan, and a proposed utility plan. The site <br /> plan, grading and drainage plan, utilities plan, and <br /> preliminary plan have been revised. New copies are included <br /> with this memo. The Planning Commission has also been supplied <br /> with the Environmental Assessment Worksheet and traffic study <br /> for the project, as well as a feasibility study for the <br /> extension of services for the entire undeveloped corridor of <br /> Highway 169 . <br /> NEW MATERIALS INCLUDED WITH MEMO <br /> • A revised site plan, grading and drainage plan, and utility <br /> plan are included as well as a revised preliminary plat. Also <br /> included are the following: <br /> 1 . The comments staff received regarding the <br /> Environmental Assessment Worksheet, which includes <br /> comments of concern by the "Citizens Who Care" group. <br /> 2 . The minutes from the February 3, 1993, Park and <br /> Recreation Committee meeting when they gave a <br /> recommendation on pedestrian ways and parks for the <br /> project. <br /> 3 . Comments from Michael Sheilds, of AKR (the <br /> developer' s architect) responding to concerns raised <br /> by Bill Weber, Planning Consultant for the City. <br /> 4 . A letter from the Elk River Chamber regarding the <br /> project. <br /> 5 . A letter from David Shay, Attorney for the Elk River <br /> Mall regarding the status of the lease agreement <br /> between Hagen' s Food and the Elk River Mall . <br /> All the above referenced items should be added to the public <br /> • record. A petition from the "Citizen' s Who Care" raising <br /> concerns with the project has already been added to the public <br /> record at the April 25, 1992 , Planning Commission meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.