Laserfiche WebLink
25IFi96 <br /> • <br /> 9. That an additional fire hydrant be placed on 6th Street to ensure fire <br /> safety in the event that 6th Street is closed. Further, that the cost <br /> of this new hydrant be borne by the developer. <br /> 10. That the parking lot be hardsurfaced with concrete curb and gutter. <br /> 11. That loading operations be limited to 7:00 a.m. to 10:00 p.m. <br /> 12. That soil compaction tests be submitted to the City prior to building <br /> permit approval. <br /> 13. That the final site plan which shows the traffic patterns be approved <br /> by the City Engineer. <br /> 14. That the electric transformer be set back 10 feet from the building and <br /> adequately screened. <br /> 15. That lighting be directed away from residential uses. <br /> 16. That the developer obtain any permits which may be necessary for access <br /> off of 6th Street. <br /> 17. That there be no restrictions on hours of operation. <br /> • 18. That a privacy fence of not less than 80% opacity and not less than <br /> five feet in height be constructed along the northern property boundary. <br /> 19. That the costs for the 6th Street closure be borne by the developer. <br /> 20. That an additional handicapped swale be put near the entrance of the <br /> store. <br /> DATED this 19th day of June, 1991. <br /> • <br />