Laserfiche WebLink
Preliminary Plat, Bruce Addition Page 5 <br /> April 20, 1993 <br /> • 8 . SEWER, WATER, GRADING, DRAINAGE, AND DRIVES HAVE A ONE <br /> YEAR COMPLETION DATE AND MUST BE ACCOMPLISHED PRIOR TO <br /> BUILDING PERMIT ISSUANCE WITHIN THE PLAT. <br /> 9 . THE ENTIRE SITE BE SEEDED FOR EROSION CONTROL IN THE SAME <br /> CONSTRUCTION SEASON AS THE GRADING. <br /> 10 . THE LOT SIZES AS PROPOSED IN THE PLAT ARE DEEMED <br /> ACCEPTABLE . <br /> 11 . THE DEVELOPER REIMBURSE THE CITY FOR THE ESTIMATED COST <br /> FOR REVIEWING THE PLAT PRIOR TO FINAL PLAT REVIEW. <br /> 12 . THE STIPULATIONS OF APPROVAL ARE AGREED TO THROUGH A <br /> DEVELOPERS AGREEMENT. <br /> 13 . A DEVELOPMENT PLAN IS APPROVED BY STAFF PRIOR TO FINAL <br /> PLAT APPROVAL. <br /> 411 <br /> . <br />