Laserfiche WebLink
<br />infO ~mrt.nON <br /> <br /> <br />MEMORANDUM <br /> <br />TO: <br /> <br />Mayor and City Council <br /> <br />FROM: <br /> <br />Stephen Rohlf, Building and Environmental Administrator <br /> <br />DATE: <br /> <br />April 11, 2005 <br /> <br />"6fZ <br /> <br />SUBJECT: Great River Energy Peaking Plant <br /> <br />Great River Energy (GRE) plans to build two natural gas-fired combustion turbine <br />Peaking Plants. The first will be built in 2006 in Cambridge, Minnesota and the other in <br />2009. GRE's property in Elk River is proposed to be the site of the 2009 Peaking Plant. <br /> <br />Attached is a letter from Mark Strohfus of GRE that explains the permitting process for <br />their Cambridge site. As part of that permitting process, GRE is required to have an <br />alternate site, which is Elk River. Although they are not proposing the first Peaking <br />Plant be located here, they will be hosting a public hearing on this issue because it is their <br />alternate site. This public hearing will take place from 6:00 PM until 9:00 PM on <br />Wednesday, April 20, 2005 at Elk River Parks and Recreation, 1104 Lions Park Drive. <br />