My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.5. SR 04-11-2005
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2005
>
04/11/2005
>
3.5. SR 04-11-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:43 AM
Creation date
4/8/2005 10:07:42 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/11/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />REQUEST FOR PROPOSAL <br /> <br />PROJECT OVERVIEW <br /> <br />The City of Elk River is currendy requesting proposals from qualified firms for the design <br />and construction of a 240' by 360' soccer/football field located at the Elk River Youth <br />Athletic Complex, 9950 165th NW, Elk River MN 55330. The site is relatively flat with <br />sandy, well draining soil. It is assumed that existing soil will be suitable for use. <br /> <br />REQUIREMENTS <br />The qualified firm must have experience of building and designing athletic fields with a list <br />of references. References should be submitted to the city for review with this proposal. <br />Engineering and/or construction firms must specify which fields they designed built or both <br />designed and built. <br /> <br />Design/ Construction firms shall cover a minimum scope of the following items and shall <br />submit pricing in the following breakout for the cities review: <br /> <br />1. Engineering services to include at a minimum: <br />Survey topography, construction plan design and development, plan review, and plan <br />submittals. <br />Firm shall submit qualifications of key engineering personnel. ~ <br />$. le,200 ~ <br />. <br /> <br />2. Erosion control to include at a minimum: <br /> <br />-silt fence, rock construction entrance, street sweeping Cl.Sl. <br />$ 5"/ coo <br /> <br />3. Site removals to include at a minimum: <br />Silt fence removal, clearing and grubbing. <br /> <br />OQ <br />.;z $"00-- <br />/ <br /> <br />$ <br /> <br />4. Field construction to include at a minimum: <br />Supervision, common excavation, berm construction, finish grading. <br />..(" ~S" 000 ~ <br />I <br />TOTAL COST FOR FIELD CONSTRUCTION <br />en;> <br /> <br />S"sna~ .. ... $ Date ~tfs- <br />
The URL can be used to link to this page
Your browser does not support the video tag.