My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1.b. PCSR 03-27-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2018
>
03-27-2018
>
6.1.b. PCSR 03-27-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2018 10:41:36 AM
Creation date
3/23/2018 10:41:00 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
3/27/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
authorization to remove the Jack Pine, we would then apply for a sign permit to be put on <br />the structure itself on the building constructed of decorative masonry, visible from highway <br />10/169. <br />Make Elk River a "Complete" Place <br />To make Elk River a more "complete" place, the addition of a recreational vehicle <br />self -storage facility would be an added benefit to the City of Elk River and its residents. <br />Giving residents the option to store their large, often times expensive, RVs/Boats/Trailers <br />etc. close to home is an added perk if they are looking for a home in a neighborhood that <br />does not have the space to store large items. The City of Elk River wants to have it all <br />and be a one stop city that offers its residents everything they need within the city itself. <br />With the approval of this proposal you would be giving your residents the benefit of never <br />having to look elsewhere or outside of the city limits to store their most prized <br />possessions. You and your residents can feel good knowing that we will store them and <br />keep them safe. <br />Proposed Details <br />Sharp & Associates has similar facilities on the north side of Highway 10 that has <br />so far been very successful. We intend to have the proposed facility function as the <br />existing facility does to ensure success for the proposed facility. <br />The proposed facility would allow for approximately seven parking stalls, <br />estimating that only three to four will be used at a time. Our current location operates with <br />this trend. During the spring and the fall we will have one or two employees on site, the <br />rest of the year we will have one part time employee at the facility, but available on call <br />during the operating hours of 8.00am — 4:30pm Monday through Friday. We currently <br />have an "emergency" call number in the event that we experience gate problems etc. on <br />the weekends at our existing facility and intend to offer the same after hour services at <br />this proposed location as well. <br />As mentioned previously, the proposed buildings would be constructed from color <br />clad metal with highlighted trim and doors, with one building that would have three sides <br />�:ASHARP & ASSOCIATES <br />(EASING i CONTRACTING 1 STORAGE www.sharp-associates.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.