Laserfiche WebLink
month after the initial inspection. The final draft scope of work will be provided to contractors <br />through the bidding process. <br />Bid Solicitation: A homeowner may request the services of a specific contractor to bid on its <br />project. CMHP will provide homeowners with a list of local participating contractors. It is the <br />responsibility of the homeowner to select 2-4 contractors from the list to whom CMHP will send <br />project bid packets. In order for a contractor who is not on the list to be awarded a bid, the <br />contractor must furnish a Contractors Application Form and the required contractor license and <br />insurance documentation. <br />Bidding: Contractors will submit bids based on the bid specifications and approved scope of work <br />prepared by CMHP. Participating contractors will be allowed to bid on any and all rehabilitation <br />projects. However, CMHP will closely monitor the number of jobs that contractors receive to <br />ensure that work is carried out in a timely manner. CMHP will also take into account homeowner's <br />satisfaction of workmanship and will have the authority to remove contractors from the <br />participating contractor list. <br />Bid openings are typically scheduled 3 weeks from the date of mailing. Contractors will mail bids <br />to CMHP and they will be opened at the scheduled time and date by CMHP staff. Bid results will <br />then be forwarded to the homeowners for review. <br />Bid Awards: It is the homeowner's responsibility to select a contractor a contractor to complete <br />the work, based on bid amounts and comfortableness with contractors. The Contract shall be <br />awarded to the owner's selection unless one of the following circumstances occurs: <br />The contractor has failed to follow the procedures outlined in the instructions to bidders <br />The contractor failed to bid according to the specifications and CMHP determines it is <br />impossible to compare the contractor's bid with the other contractors' bids <br />If the lowest bid is not selected, CMHP will review to make sure the bid selected by the homeowner <br />is responsible and reasonable and if CMHP determines that the bid is not responsible and <br />reasonable, the homeowner cannot enter into a contract with that contractor/bidder. If only one <br />bid is received, the bid will be compared to a cost estimate provided by CMHP to ensure <br />reasonableness. <br />Contractor Notification: CMHP will provide an award letter to the selected contractor and <br />unsuccessful bidder letters to those contractors not selected by the homeowner. <br />Contractor Contract: A rehabilitation contract will be executed between the homeowner and the <br />contractor. The contract will include the scope of work, contract amount, and outline the terms for <br />completion of the rehabilitation and will include the following: <br />• General conditions <br />• Timeframe for completion <br />• Warranties <br />• Special conditions <br />443114v4 MJM E1, 185-26 <br />