My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.2. SR 03-05-2018
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2018
>
03-05-2018
>
9.2. SR 03-05-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2018 2:44:21 PM
Creation date
3/1/2018 12:29:20 PM
Metadata
Fields
Template:
City Government
type
SR
date
3/5/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PO Box 27231 - Golden Valley, MN 55427 • Phone: 763/533-2030 - Fax: 763/525-0070 <br />Web: www.musco.com • Email: craig.gallop@musco.com <br />occO Craig Gallop <br />MU5 Musco Sports Lighting <br />February 28, 2018 <br />Tim Sevcik <br />Public Works Superintendent <br />City of Elk River <br />19000 Proctor Road <br />Elk River, MN55330 <br />Re: Oak Knoll Youth Football Field Lighting — Phase 2 <br />Tim, <br />Musco Sports -Lighting will provide the lighting system for phase 2 at Oak Knoll through cooperative <br />purchase. The football field will be lit to 30 footcandles using the Musco Light -Structure Green lighting <br />system. There will be (3) new 70' Light -Structures with (6) fixtures each and (1) new Sportscluster with <br />(6) fixtures. The Sportscluster is designed to mount to the existing Musco Light -Structure provided in <br />phase 1 of the project. The Light -Structure consists of a pre -stressed concrete base, galvanized steel <br />pole, remote electrical component enclosure, pole wire harness, and pole top luminaire assembly with <br />1500 watt metal halide fixtures. The Sportscluster has the same fixtures, remote electrical component <br />enclosure, and pole wire harness but is designed to mount to the existing steel pole that will be <br />common to both fields. The lighting also includes a Control -Link upgrade which will allow the City to <br />schedule and operate the lighting remotely as available for the existing Musco lighting system. <br />The turnkey cost of the project is $113,787 including the lighting, poles, concrete bases, structural <br />installation, and electrical system using aluminum wiring. The City Utility Department will install the <br />underground conduit portion of the project. Delivery of the Musco Light -Structures can take place <br />within 4 — 5 weeks of order and installation will take approximately 2 weeks. <br />C�Ga <br />Musco Sp rts-lighting <br />Lighting ... We Make It Happen. <br />
The URL can be used to link to this page
Your browser does not support the video tag.