My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Public Works
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2005
>
03/28/2005 - SPECIAL/ANNUAL REPORTS
>
Public Works
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2007 2:22:32 PM
Creation date
3/21/2005 2:35:55 PM
Metadata
Fields
Template:
City Government
type
SR
date
3/28/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Elk River <br />2004 Annual Report <br /> <br />STREETS <br /> <br />MISSION STATEMENT: <br />It is the mission of the Street Department to provide prompt and courteous services to <br />area residents in a financially responsible manner. In doing so, we strive to be safety <br />conscious, creative, helpful, ambitious, and understanding as we do whatever tasks are <br />laid before us. <br /> <br />YEAR IN REVIEW <br /> <br />SEAL COATING-CONTRACTOR: ALLIED BLACKTOp.INC. <br />· Main Street, from Parrish Avenue Bridge to Zane Street <br />· Freeport, from Main Street to Jackson Road - also re-striped to 3-lane <br />configuration <br />· Lafayette Woods Additions I & 4, entire developments <br />· Cherrywood Hills II, entire development <br /> <br />ASSESSED BITUMINOUS OVERLAYS-CONTRACTOR: UNIVERSAL PAVING CO. <br />SHOULDER RESTORATION-CITY STREET DEPARTMENT <br />· Brentwood <br />· Heavenly Hills <br />· Belgin Acres <br />· Greenhead I <br />· Meadowvale <br />· Fairhaven Hills <br /> <br />DRAINAGE PROIECTS/NPDES PROGRAM <br />· 49 outflows inspected <br />· 19 outflows repaired <br />· 4 storm water outlets repaired <br /> <br />COMPOSTINGIRECYCLlNG <br />· Contracted brush grinding <br />· City hauling costs-232 hours <br />· City loader costs-I 24 hours <br />· Biogrind-30 hours <br /> <br />$ 4,608 <br />$ 17,400 <br />$ 11,160 <br />$ 3,750 <br /> <br />Total Compost Processed <br />Total Compost Transported <br /> <br />4,500 c.y. <br />3,072 c.y. <br /> <br />OTHER PROIECTS <br />· Mud jacking to level sidewalk panels and concrete curb sections <br />· Demolition of the Koehler house for Library expansion <br />· Rebuilt retaining walls on School Street boulevard <br />
The URL can be used to link to this page
Your browser does not support the video tag.