My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1e ERMUSR 02-13-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2018
>
02-13-2018
>
6.1e ERMUSR 02-13-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2018 3:18:09 PM
Creation date
2/9/2018 3:18:08 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> ERMU Commission Eric Volk—Water Superintendent <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> February 13, 2018 6.1e <br /> SUBJECT: <br /> Staff Update <br /> ACTION REQUESTED: <br /> None <br /> DISCUSSION: <br /> • Delivered eleven new water meters. <br /> • Sealed the water meter, and took curb stop ties from eleven water services. <br /> • Completed 25 BACTI/Total Chlorine Residual Samples <br /> o All confirmed negative for Coliform Bacteria <br /> o Bacteriological/Disinfectant Residual Monthly Report submitted to the MDH <br /> • Completed 20 routine fluoride samples <br /> o All samples met MDH standards <br /> o Submitted MDH Fluoride Report <br /> • Submitted MPCA Discharge Monitoring Report (DMR) for the Diesel Generation Plant <br /> • Completed and submitted the Annual Withdrawal Report for the Water Department to the <br /> Minnesota Department of Natural Resources. <br /> • Completed and submitted the Annual Usage Report for lake water cooling usage to the <br /> Minnesota Department of Natural Resources. <br /> • WTP #5 is in the process of getting sandblasted and painted. We expect to have the <br /> painting done and the well back online by April 1. <br /> • The water operators have been working on making repairs to the water treatment plants in <br /> anticipation of the upcoming pumping season. <br /> • The initial site plan for the field services expansion went to the site plan review <br /> committee on February 5 for comments. We will be meeting with Kodet Architectural on <br /> February 21 at 10 a.m. in the ERMU Conference Room. <br /> • The City received their updated ISO Fire Protection Classification. The overall rating was <br /> increased from 5/10,to 4/10. The increase was due to efficiencies in maintenance and <br /> operations. <br /> ATTACHMENTS: <br /> • January 2018 Pumping by Well <br /> • January 2018 Accumulated Precipitation Graph <br /> • January 2018 Daily Temperature Graph <br /> Page 1 of 1 <br /> 157 <br />
The URL can be used to link to this page
Your browser does not support the video tag.