My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1 ERMUSR 02-13-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2018
>
02-13-2018
>
4.1 ERMUSR 02-13-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2018 3:08:51 PM
Creation date
2/9/2018 3:08:45 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3—INTERCONNECTION PROCESS,TECHNICAL REQUIREMENTS,AND OPERATING PROCEDURES <br /> soft transfer installations and set no longer then 100ms for quick transfer installations, shall <br /> trip the Distributed Generation circuit breaker on limited parallel interconnection systems. <br /> Power for the 62 PL relay must be independent of the transfer switch control power. The <br /> 62PL timing must be an independent device from the transfer control and shall not be part <br /> of the generation PLC or other control system. <br /> TABLE 6A <br /> SUMMARY OF RELAYING REQUIREMENTS <br /> Over- Reverse Parallel Sync- <br /> Voltage Frequency Lockout Transfer <br /> Type of current (27/59) (81 0/U) Power (86) Limit Check Trip <br /> Interconnection (50/51) (32) Timer (25) <br /> 5540 kW Yes Yes Yes Yes <br /> >40 kW Determined Determined by Determined by Determined by Determined by Determined by Determined Determined by <br /> by Engineering Engineering Study Engineering Engineering Engineering by Engineering <br /> Engineering Study Study Study Study Engineering Study <br /> Study Study <br /> Interconnection Process for Distributed Generat}o6Systems <br />
The URL can be used to link to this page
Your browser does not support the video tag.