My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1 ERMUSR 02-13-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2018
>
02-13-2018
>
4.1 ERMUSR 02-13-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2018 3:08:51 PM
Creation date
2/9/2018 3:08:45 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3—INTERCONNECTION PROCESS,TECHNICAL REQUIREMENTS, AND OPERATING PROCEDURES <br /> State of Minnesota <br /> Generation Interconnection Application Page 2 <br /> ESTIMATED LOAD INFORMATION <br /> The following information will be used to help properly design the interconnection. This Information is not <br /> intended as a commitment or contract for billing purposes. <br /> Minimum anticipated load(generation not operating): kW: kVA: <br /> Maximum anticipated load(generation not operating): kW: kVA: <br /> ESTIMATED START/COMPLETION DATES <br /> Construction start date: Completion(operational)date: <br /> DESCRIPTION OF PROPOSED INSTALLATION AND OPERATION <br /> Attach a single line diagram showing the switchgear. transformers, and generation facilities. <br /> Give a general description of the manner of operation of the generation (cogeneration. closed- <br /> transition peak shaving. open-transition peak shaving. emergency power. etc.). Also. does the <br /> Applicant intend to sell power and energy or ancillary services andlor wheel power over <br /> 's facilities. If there is an intent to sell power and energy, also define the target <br /> market. <br /> 1__ <br /> PROJECT INFORMATION (Required by MN Statute 216B.16611 subd. 3a) <br /> Nameplate Capacity of Facility: <br /> Pre-Incentive Install Cost and Cost Components: <br /> Facility Energy Source:(Circle One) <br /> Solar Wind Biomass Other(Please Specify) <br /> Zip Code of the Facility Location: <br /> SIGN OFF AREA: <br /> With this Application,we are requesting the Utility to review the proposed Generation System Interconnection. <br /> We request that the Utility identifies the additional equipment and costs involved with the interconnection of this <br /> system and to provide a budgetary estimate of those costs. We understand that the estimated costs supplied by <br /> the Utility will be estimated using the information provided.We also agree that we will supply,as requested, <br /> additional information,to allow the Utility to better review this proposed Generation System interconnection. We <br /> have read the°State of Minnesota Distributed Generation Interconnection Requirements'and will design the <br /> Generation System and interconnection to meet those requirements. <br /> Applicant Name(print): <br /> Applicant Signature: Date: <br /> SEND THIS COMPLETED&SIGNED APPLICATION AND ATTACHMENTS TO <br /> Interconnection Process for Distributed Generate Systems <br />
The URL can be used to link to this page
Your browser does not support the video tag.