My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1 ERMUSR 02-13-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2018
>
02-13-2018
>
4.1 ERMUSR 02-13-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2018 3:08:51 PM
Creation date
2/9/2018 3:08:45 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3—INTERCONNECTION PROCESS,TECHNICAL REQUIREMENTS,AND OPERATING PROCEDURES <br /> APPENDIX A <br /> DISTRIBUTED GENERATION INTERCONNECTION PROCESS <br /> SUMMARY <br /> Request for <br /> Additional -NO <br /> STEP 1 — 1 Information <br /> Application&$$ Is`N <br /> Filed with Application <br /> �y <br /> Area EPS Operator y Information <br /> ---------------„„ ''‘,,Complete? <br /> Written Response by <br /> STEP 2 / Are '� Yes <br /> N. <br /> rea Cwt of Engineering Yes�� Specialized Area EPS preliminary review of <br /> ti Engmeerirg Studi Generation System Design <br /> 15 DAYS Studies \ <br /> -- �.. Required?LL— <br /> STEP 3 <br /> r f <br /> Applicant Decision <br /> No <br /> ♦- -.__.No ----K Proceed or Not? j <br /> `,,y-$for Studies„7" <br /> N. I Area EPS Provides; <br /> ��� • Results of Engineering Studies(if required) <br /> STEP 4&5 Yes • Estimated Interconnection Costs <br /> T_ ... ..__._ • Monitoring and Control Requirements <br /> Area EPS- • Interconnection Agreement(if applicable) <br /> Specialized Engineering Studies € poj • Special Protection Requirements <br /> _ • Dedicated Facilities(if required) <br /> • Etc. <br /> STEP 6 n M.. <br /> The following FINAL Design is provided by the Applicanti „..„,_ <br /> ill they decide to proceed. <br /> • Applicable upfront payment <br /> • Engineering Data Submittal <br /> • Detailed Drawings and plans ,, .-- <br /> (one-lines,site plan,protection system) / <br /> • Signed Interconnection Agreement Yes^'- Applicant �, No ► <br /> • Relay Settings �._ Proceed or Not? <br /> • Proposed Schedule �`�.,. <br /> • Testing Plan <br /> • Etc. ----- <br /> STEP? V <br /> Area EPS reviews the FINAL plans, and provides final design approval. <br /> 15-30 DAYS Some issues at this step may need to be worked out interactively. <br /> STEP 8 — I — <br /> Parties Order Equipment <br /> 4. <br /> 1 -Hr = Area EPS approval <br /> i <br /> Testing for operation <br /> Construction STEP 9 0' STEP 10 <br /> Interconnection Process for Distributed Generate Systems <br />
The URL can be used to link to this page
Your browser does not support the video tag.