SCHEDULE 3—INTERCONNECTION PROCESS,TECHNICAL REQUIREMENTS,AND OPERATING PROCEDURES <br /> 4) The Interconnection Customer shall furnish the required insurance certificates and <br /> endorsements to the Area EPS Operator prior to the initial operation of the Generation <br /> System.Thereafter,the Area EPS Operator shall have the right to periodically inspect or <br /> obtain a copy of the original policy or policies of insurance <br /> 5) Evidence of the insurance required in Section F.1.shall state that coverage provided is <br /> primary and is not excess to or contributing with any insurance or self-insurance <br /> maintained by the Area EPS Operator. <br /> 6) If the Interconnection Customer is self-insured with an established record of self- <br /> insurance, the Interconnection Customer may comply with the following in lieu of <br /> Section F.1—5: <br /> 7) Interconnection Customer shall provide to the Area EPS Operator,at least thirty(30)days <br /> prior to the date of initial operation,evidence of an acceptable plan to self-insure to a level <br /> of coverage equivalent to that required under section F.1 <br /> 8) If Interconnection Customer ceases to self-insure to the level required hereunder,or if the <br /> Interconnection Customer is unable to provide continuing evidence of its ability to self- <br /> insure,the Interconnection Customer agrees to immediately obtain the coverage required <br /> under section F.1. <br /> 9) Failure of the Interconnection Customer or Area EPS Operator to enforce the minimum <br /> levels of insurance does not relieve the Interconnection Customer from maintaining such <br /> levels of insurance or relieve the Interconnection Customer of any liability. <br /> G) Pre-Certification <br /> The most important part of the process to interconnect generation with Local and Area <br /> EPS's is safety. One of the key components of ensuring the safety of the public and <br /> employees is to ensure that the design and implementation of the elements connected to <br /> the electrical power system operate as required. To meet this goal, all of the electrical <br /> wiring in a business or residence, is required by the State of Minnesota to be listed by a <br /> recognized testing and certification laboratory, for its intended purpose. Typically we see <br /> this as"UL" listed. Since Generation Systems have tended to be uniquely designed for <br /> each installation they have been designed and approved by Professional Engineers. <br /> This process has been set up to be able to deal with these uniquely designed systems. <br /> As the number of Generation Systems installed increase, vendors are working towards <br /> creating equipment packages which can be tested in the factory and then will only require <br /> limited field testing. This will allow us to move towards"plug and play" installations. For <br /> this reason, this interconnection process recognizes the efficiency of"pre-certification" of <br /> Generation System equipment packages that will help streamline the design and <br /> installation process. <br /> Interconnection Process for Distributed Generatiii Systems <br />