My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1 ERMUSR 02-13-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2018
>
02-13-2018
>
4.1 ERMUSR 02-13-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2018 3:08:51 PM
Creation date
2/9/2018 3:08:45 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Part T. DISPUTE RESOLUTION <br /> In case of a dispute between a utility and a qualifying facility or an impasse in the <br /> negotiations between them, either party may request the governing body to determine the <br /> issue. <br /> Part U. INTERCONNECTION CONTRACTS <br /> Subpart 1. Interconnection Standards. The utility shall provide a customer applying <br /> for interconnection with a copy of, or electronic link to, the utility's adopted <br /> interconnection process and requirements. <br /> Subp. 2. Existing Contracts. Any existing interconnection contract executed between <br /> the utility and a qualifying facility with capacity of less than 40 kilowatts remains in <br /> force until terminated by mutual agreement of the parties or as otherwise specified in the <br /> contract. The governing body has assumed all dispute responsibilities as listed in existing <br /> interconnection contracts. Disputes are resolved in accordance with Part T. <br /> Subp. 3. Renewable Energy Credits; Ownership. Generators own all renewable <br /> energy credits unless other ownership is expressly provided for by a contract between a <br /> generator and the utility <br /> Part V. UNIFORM CONTRACT. <br /> The form for uniform contract that shall be used between the utility and a qualifying <br /> facility having less than 40 kilowatts of capacity is as shown in subpart 1. <br /> Subpart 1. Contract for Cogeneration and Small Power Production Facilities. (See <br /> attached contract form.) <br /> ADOPTED ON: <br /> SIGNED: <br /> Chair of the Elk River Municipal Utilities Commission <br /> 9 <br /> 54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.