Laserfiche WebLink
Part T. DISPUTE RESOLUTION <br /> In case of a dispute between a utility and a qualifying facility or an impasse in the <br /> negotiations between them, either party may request the governing body to determine the <br /> issue. <br /> Part U. INTERCONNECTION CONTRACTS <br /> Subpart 1. Interconnection Standards. The utility shall provide a customer applying <br /> for interconnection with a copy of, or electronic link to, the utility's adopted <br /> interconnection process and requirements. <br /> Subp. 2. Existing Contracts. Any existing interconnection contract executed between <br /> the utility and a qualifying facility with capacity of less than 40 kilowatts remains in <br /> force until terminated by mutual agreement of the parties or as otherwise specified in the <br /> contract. The governing body has assumed all dispute responsibilities as listed in existing <br /> interconnection contracts. Disputes are resolved in accordance with Part T. <br /> Subp. 3. Renewable Energy Credits; Ownership. Generators own all renewable <br /> energy credits unless other ownership is expressly provided for by a contract between a <br /> generator and the utility <br /> Part V. UNIFORM CONTRACT. <br /> The form for uniform contract that shall be used between the utility and a qualifying <br /> facility having less than 40 kilowatts of capacity is as shown in subpart 1. <br /> Subpart 1. Contract for Cogeneration and Small Power Production Facilities. (See <br /> attached contract form.) <br /> ADOPTED ON: <br /> SIGNED: <br /> Chair of the Elk River Municipal Utilities Commission <br /> 9 <br /> 54 <br />