My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1 ERMUSR 02-13-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2018
>
02-13-2018
>
4.1 ERMUSR 02-13-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2018 3:08:51 PM
Creation date
2/9/2018 3:08:45 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subp. 3. Compensation to qualifying facility; energy purchase. The utility shall <br /> purchase all energy which is made available to it by the qualifying facility. At the option <br /> of the qualifying facility, its entire generation must be deemed to be made available to the <br /> utility. Compensation to the qualifying facility must be the energy rate shown on schedule <br /> 5. <br /> Subp. 4. Compensation to qualifying facility; capacity purchase. If the qualifying <br /> facility provides firm power to the utility, the capacity component must be the utility's <br /> net annual avoided capacity cost per kilowatt-hour averaged over all hours shown on <br /> schedule 5, divided by the number of hours in the billing period. If the qualifying facility <br /> does not provide firm power to the utility, no capacity component may be included in the <br /> compensation paid to the qualifying facility. <br /> Part O. TIME-OF-DAY PURCHASE RATES. <br /> Subpart 1. Applicability. Time-of-day rates are required for qualifying facilities with <br /> capacity of 40 kilowatts or more and less than or equal to 100 kilowatts, and they are <br /> optional for qualifying facilities with capacity less than 40 kilowatts. Time-of-day rates <br /> are also optional for qualifying facilities with capacity greater than 100 kilowatts if these <br /> qualifying facilities provide firm power. <br /> Subp. 2. Method of billing. The qualifying facility must be billed for all energy and <br /> capacity it consumes during each billing period according to the utility's applicable retail <br /> rate schedule. <br /> Subp. 3. Compensation to qualifying facility; energy purchases. The utility shall <br /> purchase all energy which is made available to it by the qualifying facility. Compensation <br /> to the qualifying facility must be the energy rate shown on schedule 5. <br /> Subp. 4. Compensation to qualifying facility; capacity purchases. If the qualifying <br /> facility provides firm power to the utility, the capacity component must be the capacity <br /> cost per kilowatt shown on schedule 5 divided by the number of on-peak hours in the <br /> billing period. The capacity component applies only to deliveries during on-peak hours. If <br /> the qualifying facility does not provide firm power to the utility, no capacity component <br /> may be included in the compensation paid to the qualifying facility. <br /> Part P. ROLL-OVER CREDIT PURCHASE RATES. <br /> Subpart 1. Applicability. The roll-over credit rate is available only to qualifying facilities <br /> with capacity of less than 40 kilowatts which choose not to offer electric power for sale on <br /> average retail utility energy rate basis, time-of-day basis or simultaneous purchase and <br /> sale basis. <br /> 7 <br /> 52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.