My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.6. HANDOUT HPSR 01-18-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Heritage Preservation Commission
>
HPC Packets
>
2018
>
01-18-2018
>
5.6. HANDOUT HPSR 01-18-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2018 12:30:41 PM
Creation date
1/12/2018 10:56:23 AM
Metadata
Fields
Template:
City Government
type
HPSR
date
1/18/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A <br /> Zack,the following iuwhat nohave learned inputting the proposal together. <br /> Grant Costs <br /> l. Building Scan with olaser camera[ndevelop initial drawings $ 3,100 to $ 3,100 <br /> 2. Initial Environmental $ � <br /> omuo\u|B1udy ,500 to $ 3,500 <br /> 3. Grant Fees for Architectural Services $ 6,IO0 to $ 9,000 <br /> Construction Costs <br /> l. Painting the elevator(CDG estimate adjusted for 5Y6inflation per year) $79,000 to $98,000 <br /> 2. Steel Repair $ 9`000 to $19,000 <br /> 3. Environmental Testing $25,000 to $40,000 <br /> 4. Environmental removal oflead paint,etc. $39,000 to $80,000 <br /> 5. Misc. $ 8,000 to $12,000 <br /> Construction Soft Costs <br /> l. Contingency Approx. l8% $16,000 to $20.000 <br /> 2. Owners Costs $ 6,500 W $10,000 <br /> 3. Architectural Engineering Fees estimate(Basic Services) $13,000 to $17,000 <br /> 4. Reimbursable costs $ 500 to $ 1,500 <br /> 5. Engineering costs(eohmate) $ 5,000 to $ 5,000 <br /> 6. Testing,permits,etc.(estimate) 2 <br /> �) ,500 to $ 2,500 <br /> Total $210,600 to $320,600 <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.