My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2. SR 01-16-2018
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2018
>
01-16-2018
>
7.2. SR 01-16-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2018 11:14:49 AM
Creation date
1/11/2018 3:39:02 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/16/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/23/2017 <br />Conditional Use Permit Narrative <br />Scope of Project <br />P9 <br />lm� . <br />LIA IP U P'J' <br />VAN MAN <br />architects and ouilders <br />RECEIVED <br />NOV 27 2011 <br />The proposed plan for LeFebvre Companies will add an additional 2,000 square feet of <br />office space to the existing company facility. The addition would include eight offices <br />and a breakroom. The new addition will be similar in height to the existing building. In <br />addition, G parking stalls will be removed to provide green space around the front of the <br />building. These stalls will he replaced 15 with new parking stalls on the site. The exterior <br />finish shall be fiber cement panels and stone to add visual interest to the area and the site <br />in accordance with Architectural Standards of Elk River city code Section 30 - 938. <br />Comprehensive Plan applicability <br />The removal of the existing office trailer and addition to the facility will benefit both <br />LeFebvre Companies and the neighborhood. The proposed improvements would benefit <br />the approximately 30 employees that currently work there with added space better <br />proximity, and an updated look and feel. The addition will not change the operation & <br />will comply with the city comprehensive plan. <br />Hours of operation for the facility — 8:00 AM to 5:00 PM Monday through Friday <br />Proposed Uses <br />Lefebvre Companies operates trucking services. The facility is used for semi -truck <br />maintenance and cleaning, while the offices provide dispatch and administrative support <br />for the company. The current parking stall count is 55 and the expected total parking lot <br />count at the completion of the project will be 54. The parking modification will be <br />incorporated with the existing lot. <br />Proposed Signage <br />There will be a new monument sign to replace the existing sign on site. The new sigm will <br />incorporate materials used on the building to create a comprehensive look. The sign shall <br />not exceed city size and lighting standards. <br />Construction Schedule <br />LeFebvre Companies anticipates a construction start in early 2018 to be completed within <br />the year. <br />Outdoor storage/Screening <br />No additional exterior storage is being provided and nothing requiring screening will be <br />added. <br />9600 54th Ave N, Suite 180 ■ Plymouth, MN 55442 <br />Toll Free: 888.327.2817 • Local: 753.541.9552 • Fax: 753.541.9857 <br />www.vanmanab.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.