Laserfiche WebLink
Original Option <br /> Design Elements <br /> ■ Remove the Barn & construct 1 new premium indoor ice sheet <br /> ■ Renovate Olympic rink into NHL size <br /> ■ Reserve space for a future 3rd sheet <br /> ■ Provide dryland training space <br /> ■ Provide team rooms, varsity locker rooms, and coach rooms <br /> ■ Include meeting room space <br /> ■ Add turf for single arena floor when ice is removed <br /> ■ Office and support area for Lions Club (if needed) <br /> ■ Leasable retail space for chiropractic or apparel (if desired) <br /> Anticipated construction schedule - March 2018 to June 2019 <br />