Laserfiche WebLink
PHASING <br />TYPICAL LOT DIMENSIONS <br />ROW ROW <br />z <br />_T T_ I T_ I _F_F <br />.—ING E.-ING <br />PAD PA. <br />L <br />T <br />S5 <br />w-. <br />�w 1w <br />ED <br />�w 10 —PHASING LOT SLIMMARYAIIIIIIIIIIIIIIIIIIIIIIII� <br />�2 w -n- 3 ILDTI <br />IN 'I'NT DA N 36 '1 <br />ADDITIDN 11 <br />3RDADDMON 11 '7 <br />----------------- ------------------ PHASE L 27 27 <br />z z PHASE M 11 45 <br />PHA N a 22 <br />PHA �E <br />ED 4E t <br />PHA 42.12 54 L <br />PH o <br />ZE P. 34 2D <br />REAR REAR PHASE R '4 <br />E <br />TOTAL 373,12 385 <br />65'LOT 70'LOT I <br />AVERAGE- AVERAGE- F <br />50'WIDE BY 50'WIDE BY <br />60'DEEP PAD 60'DEEP PAD 1: 7 <br />ROW <br />ROW <br />z A <br />�F --------- I — ------ <br />BUILDING t I <br />1�PAD <br />w 1w <br />'-w <br />z' <br />L ;.w: 2zw -- I <br />w- --------------- U, 0 <br />z D, <br />----------------- w. <br />z <br />REAR REAR <br />65'LOT 65'LOT <br />AVERAGE AVERAGE- <br />_ ­T <br />50'WIDE BY 50'WIDE BY <br />50'DEEP PAD 40'DEEP PAD <br />Summary Revision History Certification Client Project Sheet Title Sheet No. Revisionl <br />D,,ig,,,d DES N,. D- By SOMi L"II <br />Appro PAXIVIAR, LLC MISKE MEADOW <br />SSOUTH PRELIMINARY SITE PLAN <br />&'Sambatek Ph... `P`RdEL1EMTL1NARY ELK RIVER, IVIN C3.09 <br />:�, www.sambatek.com B�'�'k '/ � �11 11. LU 1. DETAILS <br />Engineering I Surveying I Planning I Environmental Initial ISSUe 10/18/17 Project No . 20460 <br />