Laserfiche WebLink
Capital Improvement Plan 2018 a7,�u 2022 <br /> Department Engineering <br /> City of Elk River, Mbnnesota Contact Engineer <br /> Type Maintenance <br /> Project# �T -1 Useful Life Unassigned <br /> Project Name Storm Water projects Category Maintenance projects <br /> Desedption <br /> Annual pond cleaning,stormwater repairs,BMP inventory. <br /> Storm Water infrastructure projects combined with street projects are included on the pavement management CIP sheet. <br /> Justification <br /> These annual projects include the testing,removal,and disposal of sediment deposits from our stormwater ponds. This is needed to assure these <br /> devices are functioning as designed and achieving the water quality standards of our NPDES permit. <br /> The smaller stormwater repairs include minor pipe upsizing,culvert replacement,manhole and catch basin repairs and fixing of washout areas. <br /> Expenditures 2018 2019 2020 2021 2022 Total <br /> Construction/Maintenance 450,000 200,000 650,000 <br /> Total 450,000 200,000 650,000 <br /> Funding Sources 2018 2019 2020 2021 2022 Total <br /> Storm Water 258,000 203,000 303,000 208,000 1,012,000 <br /> Total 298,000 203,000 303,000 208,000 1,012,000 <br /> 2018-2022 CAPITAL IMPROVEMENT PLAN Page 54 <br />