My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-27-1993 CC MIN
ElkRiver
>
City Government
>
City Council
>
Council Minutes
>
City Council 1974 - Present
>
1990-1999
>
1993
>
09-27-1993 CC MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:33 AM
Creation date
3/15/2005 1:42:04 PM
Metadata
Fields
Template:
City Government
type
CCM
date
9/27/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Elk River city Council Meeting <br />September 27, 1993 <br /> <br />Page 11 <br /> <br />e <br /> <br />ADVERTISEMENT FOR BIDS IN THE <br />DRAINAGE IMPROVEMENT OF 1993. <br />MOTION. THE MOTION CARRIED 3-0. <br /> <br />MATTER OF THE <br />COUNCILMEMBER <br /> <br />DEERFIELD 3RD STORM <br />SCHEEL SECONDED THE <br /> <br />7.7 T.H. Lift Station <br /> <br />city Engineer, Terry Maurer, informed the Council that he talked to <br />LaTour Construction and informed them that the City would not be <br />returning the bid bond. He indicated that LaTour Construction stated <br />that they would be able to honor the bid for improvements for the Trunk <br />Highway 10 lift station with some minor modifications. <br /> <br />COUNCILMEMBER HOLMGREN MOVED TO ADOPT RESOLUTION 93-61, A RESOLUTION <br />ACCEPTING BID AND AUTHORIZING EXECUTION OF CONTRACT IN THE MATTER OF <br />THE TH10 LIFT STATION AND TRUNK SANITARY SEWER IMPROVEMENT OF 1993. <br />COUNCILMEMBER SCHEEL SECONDED THE MOTION. THE MOTION CARRIED 3-0. <br /> <br />7.8. - 7.9. Consider Pay Estimate for Heritage Landing and Consider Pay <br />Estimate for Mississippi Oaks <br /> <br />e <br /> <br />COUNCILMEMBER SCHEEL MOVED TO APPROVE PAY ESTIMATE #3 TO LATOUR <br />CONSTRUCTION IN THE AMOUNT OF $332,552.91 FOR WORK COMPLETED ON THE <br />HERITAGE LANDING IMPROVEMENTS AND ALSO TO APPROVE PAY ESTIMATE #1 TO <br />LATOUR CONSTRUCTION IN THE AMOUNT OF $91,323.14 FOR WORK COMPLETED ON <br />THE MISSISSIPPI OAKS IMPROVEMENTS. COUNCILMEMBER HOLMGREN SECONDED THE <br />MOTION. THE MOTION CARRIED 3-0. <br /> <br />7.10. Consider Pay Estimate for City Hall/Police Facility <br /> <br />Finance Director, Lori Johnson, informed the <br />being held from the total project cost <br />repaired as required by the City. <br /> <br />Council that $5,000 is <br />to ensure that the roof is <br /> <br />COUNCILMEMBER HOLMGREN MOVED TO APPROVE PAY ESTIMATE #13 <br />CONSTRUCTION, INC., IN THE AMOUNT OF $65,025.86 FOR WORK <br />THE CITY HALL. COUNCILMEMBER SCHEEL SECONDED THE MOTION. <br />CARRIED 3-0. <br /> <br />TO BOR-SON <br />COMPLETED ON <br />THE MOTION <br /> <br />7.11. Final Pay Estimate for 4th street and Holt Avenue Improvement <br />Project <br /> <br />COUNCILMEMBER HOLMGREN <br />BITUMINOUS CONSULTING <br />$18,018.96 FOR WORK <br />IMPROVEMENT PROJECT. <br />MOTION CARRIED 3-0. <br /> <br />MOVED TO AUTHORIZE THE FINAL PAY ESTIMATE TO <br />AND CONTRACTING, INC., IN THE AMOUNT OF <br />COMPLETED ON THE 4TH STREET AND HOLT AVENUE <br />COUNCILMEMBER SCHEEL SECONDED THE MOTION. THE <br /> <br />7.12. Jackson Avenue Sidewalk Improvements <br /> <br />e <br /> <br />City Engineer, Terry <br />received for the Jackson <br />that the low bid was <br />$21,133.50. <br /> <br />Maurer, noted that a total of four bids were <br />Avenue sidewalk improvements. He indicated <br />from Landmark Concrete, Inc., in the amount of <br />
The URL can be used to link to this page
Your browser does not support the video tag.