Laserfiche WebLink
Tiller Corporation: Elk River Sand and Gravel Mine    2 | Page  <br />Conditional Use Permit Amendment Application  October 17  <br />  <br />                  Source: 2017 Portland Cement Association <br />  <br />Plants are sometimes located on or near the construction project and many times they are located  <br />at the aggregate source.  When the majority of the aggregate is being sourced from one site it is  <br />common to position the portable plant at the aggregate source and then transport the concrete  <br />to the project.  <br />  <br />Figure 3, Surrounding Area, illustrates surrounding land uses and the permitted area.  The Site  <br />box on Figure 3 indicates the approximate area where a portable concrete plant would likely be  <br />located.   <br />  <br />7. Request:  <br />  <br />Tiller is respectfully requesting an amendment to the existing CUP for the Site that will allow the  <br />ability to locate a portable concrete plant at the Site on as needed basis for local projects.  No  <br />other changes are being sought for any aspect of the CUP.  <br />  <br />The necessary State permits for the portable concrete plant will be in place prior to locating the  <br />plant at the Site.  In addition, Tiller plans to notify City staff on a case by case basis when a plant  <br />is scheduled to be located at the Site.  This will allow an opportunity to communicate the timing  <br />of these projects with various City contacts.   <br />  <br />