My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 11-20-2017
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2017
>
11-20-2017
>
8.1. SR 11-20-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2017 8:27:53 AM
Creation date
11/17/2017 8:26:32 AM
Metadata
Fields
Template:
City Government
type
SR
date
11/20/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: 11/6/2017ELK RIVER ICE ARENALine Name Duration Start Finish20182019FebruaryMarchAprilMayJuneJulyAugustSeptemberOctoberNovemberDecemberJanuaryFebruaryMarchJanuary1522295121926512192629162330714212841118252916233061320273101724181522295121926310172431714212841118254111825126128130132134136138140142144146148150152154156158160162164166168170172174176178180182184186343536373839404142434445464748495051525354555657585960616263646566SLAB ON GRADE/RAMPSPIPING/INSULATION/SLAB POURCONCRETE CURE TIME READY FOR REFRIGERATION EQUIPMENTMEP REFRIGERATION ROOMPAINTMEP FINISHES CHECK/TEST/STARTUPREADY TO MAKE ICEICE ARENA-MECHANICAL/CONCOURSE-LOWERLEVELBLOCK WALLSMEP UNDERGROUNDSLAB ON GRADESLAB ON GRADE/RAMPSBLOCK WALLS-THICKENED SLABMEP ROUGH PAINTCERAMIC TILEDOORS/HARDWARECEILING GRIDMEP FINISHESTOILET PARTITIONS/GRAB BARSCEILING PADFLOORINGICE ARENA-LOBBY LOWER LEVELBLOCK WALLSMEP UNDERGROUNDSLAB ON GRADE/RAMPSMEP ROUGH BLOCK WALLS-THICKENED SLABPAINTDOORS/HARDWARECEILING GRID7d20d20d60d10d15d20d85d15d15d5d10d20d14d15d15d10d3d20d5d2d10d84d10d15d10d15d5d15d5d3d07/30/1808/08/1809/06/1810/02/1810/02/1810/04/1810/18/1812/14/1801/16/1907/23/1807/23/1808/13/1808/21/1808/28/1808/28/1809/04/1809/12/1809/24/1810/03/1810/03/1810/05/1811/02/1811/02/1811/06/1808/13/1808/13/1808/27/1809/11/1809/25/1809/25/1810/09/1810/30/1810/30/1808/07/1809/05/1810/03/1810/02/1812/28/1810/17/1811/07/1801/15/1901/16/1911/19/1808/10/1808/31/1808/27/1809/11/1809/25/1809/21/1810/02/1810/12/1810/16/1810/05/1811/01/1811/08/1811/05/1811/19/1812/11/1808/24/1809/17/1809/24/1810/15/1810/01/1810/29/1811/05/1811/01/18SLAB ON GRADE/RAMPSPIPING/INSULATION/SLAB POURCONCRETE CURE TIME READY FOR REFRIGERATION EQUIPMENTMEP REFRIGERATION ROOMPAINTMEP FINISHES CHECK/TEST/STARTUPREADY TO MAKE ICEICE ARENA-MECHANICAL/CONCOURSE-LOWER LEVELBLOCK WALLSMEP UNDERGROUNDSLAB ON GRADESLAB ON GRADE/RAMPSBLOCK WALLS-THICKENED SLABMEP ROUGH PAINTCERAMIC TILEDOORS/HARDWARECEILING GRIDMEP FINISHESTOILET PARTITIONS/GRAB BARSCEILING PADFLOORINGICE ARENA-LOBBY LOWER LEVELBLOCK WALLSMEP UNDERGROUNDSLAB ON GRADE/RAMPSMEP ROUGH BLOCK WALLS-THICKENED SLABPAINTDOORS/HARDWARECEILING GRIDSLAB ON GRADE/RAMPSPIPING/INSULATION/SLAB POURCONCRETE CURE TIME READY FOR REFRIGERATION EQUIPMENTMEP REFRIGERATION ROOMPAINTMEP FINISHES CHECK/TEST/STARTUPREADY TO MAKE ICEICE ARENA-MECHANICAL/CONCOURSE-LOWER LEVELBLOCK WALLSMEP UNDERGROUNDSLAB ON GRADESLAB ON GRADE/RAMPSBLOCK WALLS-THICKENED SLABMEP ROUGH PAINTCERAMIC TILEDOORS/HARDWARECEILING GRIDMEP FINISHESTOILET PARTITIONS/GRAB BARSCEILING PADFLOORINGICE ARENA-LOBBY LOWER LEVELBLOCK WALLSMEP UNDERGROUNDSLAB ON GRADE/RAMPSMEP ROUGH BLOCK WALLS-THICKENED SLABPAINTDOORS/HARDWARECEILING GRID4d
The URL can be used to link to this page
Your browser does not support the video tag.