Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />-. <br /> <br />city Council Minutes <br />May 17, 1993 <br /> <br />Page 12 <br /> <br />7.7. Consider Final Plat of Mississippi <br />Moldenhauer (Case No. P-93-05) <br /> <br />Oaks <br /> <br />(Phase <br /> <br />One) <br /> <br />by <br /> <br />Irv <br /> <br />steve Rohlf indicated that Irv Moldenhauer, developer of <br />Mississippi Oaks is requesting final plat approval of the first phase <br />which will contain 37 single family lots. Discussion was held <br />regarding the proposed park for the plat. It was noted that the park <br />is proposed to be included in phase 4 and 5 of the plat of Mississippi <br />Oaks. Councilmember Holmgren indicated he is not comfortable with the <br />park being in phases 4 and 5. He felt the park should be included in <br />the earlier phases of the plat as there will be several lots created <br />and people who would use the park prior to phases 4 and 5. <br /> <br />Mayor Duitsman requested that the park issue be referred to the Park <br />and Recreation Commission for review and recommendation. <br /> <br />COUNCILMEMBER HOLMGREN MOVED TO APPROVE PHASE I OF MISSISSIPPI OAKS <br />ADDITION WITH THE STIPULATION THAT THE PARK AND RECREATION COMMISSION <br />REVIEW THE LOCATION, SIZE AND TIMING OF THE PARK AND THAT THE PARK BE <br />APPROVED PRIOR TO FINAL PLAT REVIEW OF THE SECOND PHASE AND FURTHER, <br />THAT THE FINAL PLAT OF THE FIRST ADDITION BE APPROVED WITH THE <br />FOLLOWING STIPULATIONS: <br /> <br />1. THAT THERE BE NO CONNECTION OF RIVERVIEW DRIVE TO THE EXISTING <br />RIVERVIEW DRIVE IN PALMER'S ADDITION AT THE PRESENT TIME. <br /> <br />2. <br /> <br />THE CITY ENGINEER PREPARES THE PLANS AND SPECS FOR ROAD, SEWER, <br />WATER, AND STORM DRAINAGE. <br /> <br />3. <br /> <br />PARK DEDICATION <br />A. TRAIL - A 20' WIDE TRAIL MUST BE DEDICATED FROM <br />OF THE TRAIL IN HERITAGE LANDING TO THE EXISTING <br />OF RIVERVIEW DRIVE. <br /> <br />THE SOUTH END <br />RIGHT-OF-WAY <br /> <br />B. PARK DEDICATION FEES THE 37 LOTS IN THE FIRST PHASE OF <br />MISSISSIPPI OAKS MUST PAY PARK DEDICATION FEE AT A RATE OF <br />$400.00 PER LOT FOR A TOTAL OF $14,400 FOR THE 36 ADDITIONAL <br />LOTS CREATED MINUS CREDIT FOR A PORTION OF TRAIL DEDICATED. <br /> <br />4. A DEVELOPMENT PLAN IS APPROVED BY STAFF PRIOR TO RECORDING THE <br />PLAT. <br /> <br />5. THAT THE FOLLOWING PERMITS ARE OBTAINED: DEPARTMENT OF HEALTH FOR <br />THE EXTENSION OF WATER; MPCA FOR THE EXTENSION OF SEWER; NPDES <br />FOR GRADING; DNR FOR DEWATERING; AND ARMY CORPS OF ENGINEERS <br />FOR THE SEDIMENTATION POND, IF NECESSARY. <br /> <br />6. THAT 17' OF ADDITIONAL RIGHT-OF-WAY IS DEDICATED TO THE COUNTY <br />ALONG COUNTY ROAD 30. <br /> <br />7. <br /> <br />PROVISIONS ARE MADE TO ACCOMMODATE THE EXTENSION OF URBAN SERVICES <br />TO THE EXCEPTION SHOWN IN THE NORTHWEST CORNER OF THE PLAT. <br />