Laserfiche WebLink
the content of each load. <br /> iii. Licensee shall submit to the City a quarterly report containing, at the minimum, the <br /> following information of each load inspected: <br /> 1. The hauler and truck number of the load; <br /> 2. Any Prohibited waste found in the load. <br /> 3. Licensee's efforts to identify the generator of any Prohibited waste found in the load. <br /> 4. The identity, if known by Licensee, of the generator of any Prohibited waste found in <br /> the load; <br /> 5. The actions which Licensee is taking against the generator and hauler of any such <br /> Prohibited waste found in the load; <br /> 6. Licensee's record of disposal of any Prohibited waste found in the load. <br /> iv. Licensee shall advise the City Environmental Administrator, if requested, when these loads <br /> are being inspected and the City shall have the right to have its personnel on-site to observe <br /> the inspection process. <br /> V. City shall have the right to thoroughly inspect the Resource Processing Plant for <br /> cleanliness and compliance with the other terms of this License. <br /> vi. To further ensure compliance with restrictions in this License, and in Chapter 58, Article <br /> III of the City Code of Ordinances, on the handling and processing of hazardous and <br /> dangerous wastes, and to protect the public health, safety, and general welfare of the <br /> citizens of Elk River, the City shall have the right, upon thirty (30) days' notice to <br /> Licensee, to have an inspector at the Resource Processing Plant twenty-four (24)hours a <br /> day. These inspectors shall have the right of access to all areas of the Resource Processing <br /> Plant, twenty-four (24)hours a day, for the purposes of inspection to ensure compliance <br /> with all of the terms and conditions of this License, the Permit for the facility, and Chapter <br /> 58, Article III of the City Code. The on-site City inspector shall have the right at any time <br /> to take one or more of the following actions: <br /> vii. Order a load of MSW inspected, pursuant to the procedures set forth above; <br /> viii. Order the Resource Processing Plant shut down if necessary to bring it into compliance <br /> with any other term or condition of this License, the Permit for the Project, or Chapter 58, <br /> Article III of the City Code. <br /> 12.) RDF and Reject Disposal. All wastes received shall be disposed of in strict compliance <br /> with the requirements of Chapter 58, Article III of the City Code and Chapter 7035 of Minnesota <br /> Rules. <br /> 13.) RDF Truck Haul Routes. To minimize the impact of the Project on other land uses and <br /> activities in the area, incoming and outgoing traffic from the Project facilities shall be controlled <br /> by the Licensee in such a manner as to provide orderly and safe ingress and egress and so as not to <br /> impede or interfere with general traffic. <br /> Page 7 <br />