My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. SR 11-20-2017
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2017
>
11-20-2017
>
4.5. SR 11-20-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2017 12:09:01 PM
Creation date
11/15/2017 11:47:55 AM
Metadata
Fields
Template:
City Government
type
SR
date
11/20/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(c) Photo documentation of all critical aspects of construction; <br /> (d) Pressure testing results for leachate transmission pipes; <br /> (e) Narrative description of all as-built variances from the plans and/or <br /> specifications; <br /> (f) As-built cross-sections of the liner subgrade; <br /> (g) As-built elevations for all pipe inlets and outlets and pump- <br /> on/pump-off controls; <br /> (h) Completed manufacturer warranties; <br /> (i) All physical testing results for soils and other materials used in the <br /> construction <br /> ERL must prepare detailed record drawings/documents of recirculation <br /> drainfield construction, which are certified by an engineer. The drawings will <br /> include survey measurements of the drainfield areas to document position within <br /> the cell, suitable base contours and piping elevations. All construction must be <br /> fully documented. <br /> (9) Barrier Layer Construction Notification. Licensee shall notify the City at <br /> least two (2) days in advance of liner barrier layer installation or final cover <br /> barrier layer installation. Licensee shall assist the City in arranging inspection of <br /> the site at any reasonable time the City requests. The Licensee shall keep the City <br /> informed of ongoing construction progress and shall specifically notify the City of <br /> significant changes encountered in the geological, hydrological, or construction <br /> conditions. The City may reasonably require work, which is covered or otherwise <br /> obscured prior to City inspection, to be re-excavated for City inspection. <br /> (10) Temporary Fencing-On Site Litter Control. Litter control fences shall be <br /> maintained around the working area(s) of the landfill to prevent the blowing of <br /> paper or other litter on or off site. The Licensee shall assign employees to engage <br /> in a regular and routine program to inspect the Landfill Site and clean up areas <br /> where litter accumulates on the Landfill Site. <br /> (11) Permanent Fencing. Licensee shall maintain a minimum six-foot high <br /> fence around the perimeter of the Landfill property to address reasonable <br /> concerns regarding public safety, trespassing or uncontrolled dumping. <br /> (12) Sanitary Facilities. Adequate sanitary facilities and shelter shall be <br /> provided for site personnel. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.