Laserfiche WebLink
<br />CITY COUNCIL MEETING <br />OCTOBER 3, 1994 <br /> <br />PAGE 3 <br /> <br />e AVOIDED AS MUCH AS POSSIBLE, BUT DUE TO THE OVERRIDING CONCERN OF <br />SAFETY THAT FILLING OF THIS WETLAND IS APPROPRIATE ACCORDING TO THE <br />WETLAND CONSERVATION ACT AND ALSO THAT THE MITIGATION PLAN IS <br />TECHNICALLY SOUND AND MEETS THE INTENT OF THE WETLAND CONSERVATION <br />ACT. COUNCILMEMBER HOLMGREN SECONDED THE MOTION. THE MOTION <br />CARRIED 4-0. <br /> <br />5.9. Consider Hillside Estates Wetland Mitiaation Plan <br /> <br />Steve Rohlf indicated that there are two wetland areas that are proposed to be <br />filled in conjunction with the Hillside Estates development project. He stated that <br />after review of these two areas by the Technical panel, it was determined that <br />that both were appropriate filling of wetlands due to safety concerns and water <br />quality issues. Steve Rohlf reviewed the replacement location for the two <br />wetlands that will be filled. : <br /> <br />e <br /> <br />COUNCILMEMBER SCHEEL MOVED THAT THE COUNCIL FINDS THAT THE IMPACT ON <br />WETLANDS HAVE BEEN AVOIDED AND/OR MINIMIZED AS MUCH AS POSSIBLE, AND <br />THAT DUE TO SAFETY CONCERNS FOR THE ALIGNMENT OF 193RD AVENUE, WHICH IS <br />IDENTIFIED AS A LOCAL COLLECTOR, AND DUE TO WATER QUALITY, THAT FILLING THE <br />WETLANDS IN QUESTION IS APPROPRIATE AND THAT THE MITIGATION PLAN IS <br />TECHNICALLY SOUND AND MEETS THE INTENT OF THE WETLAND CONSERVATION ACT <br />AND FURTHER THAT THE CREATION OF WETLANDS IS DONE PRIOR TO THE FILLING OF <br />WETLANDS, OR A LETTER OF CREDIT BE ESTABLISHED FOR THE COST OF THE WORK. <br />COUN{:ILMEMBER HOLMGREN SECONDED THE MOTION. THE MOTION CARRIED 4-0. <br /> <br />5.10. Consider Street Liqht Bids for Elk Park Center and Hillside Estates <br /> <br />The City Administrator indicated that the bids for the street lights for Elk Park <br />Center and Hillside Estates have been received. The Utilities Commission <br />Consultant Mr. Bob Ehlers, has reviewed the bids and is recommending approval <br />of the low bid to Electric Services Company, at $74,431.20. Approximately $54,000 <br />is for Elk Park Center and the remaining is for the Hillside Estates development. <br /> <br />COUNCILMEMBER DIETZ MOVED TO ACCEPT THE LOW BID FOR STREET LIGHTS FROM <br />ELECTRIC SERVICES COMPANY IN THE AMOUNT OF $74,431.20 FOR THE ELK PARK <br />CENTER PROJECT AND HILLSIDE ESTATES DEVELOPMENT. COUNCILMEMBER <br />HOLMGREN SECONDED THE MOTION. THE MOTION CARRIED 4-0. <br /> <br />5.11 . Discuss Clerical Chanqe <br /> <br />The City Administrator indicated that Cathy Schmidt of the Planning Department <br />has submitted her resignation. the City Administrator requested permission to <br />advertise locally for another clerical position. He indicated that the City is still <br />debating some options regarding the filling of this position. <br /> <br />e <br /> <br />COUNCILMEMBER DIETZ MOVED TO AUTHORIZE THE REPLACEMENT OF THE <br />PLANNING SECRETARY POSITION OR FOR ANOTHER CLERICAL POSITION, IF THE <br />PLANNING SECRETARY POSITION IS FILLED BY PROMOTION. COUNCILMEMBER <br />HOLMGREN SECONDED THE MOTION. THE MOTION CARRIED 4-0. <br />