Laserfiche WebLink
Capital Improvement Plan 2018 rhru 2022 <br />Department Infrastructure Improvements <br />City of Elk River, Minnesota <br />Project ST -12 <br />Project Name Signalization - Twin Lakes Rd & 181st Ave <br />a signal system including EVP at the <br />Justification <br />Ave. <br />Contact Engineer <br />Type Infiastmcture <br />Useful Life 20 years <br />Category Shed Construction <br />Continued traffic demands at this intersection will warrant the installation of a signal system in the near future. Actual year for construction will be <br />based on traffic warrent criteria being met. Costs reflect 1/4 of the cost of the system as Sherbume County will participate in their 3 legs of the <br />intersection. <br />Expenditures 2018 2019 2020 2021 2022 Total <br />Planning/Design 87,500 87,500 <br />Total 87,500 87,500 <br />Funding Sources 2018 2019 2020 2021 2022 Total <br />Municipal State Aid 87,500 87,500 <br />Total 87,500 87,500 <br />2018-2022 CAPITAL IMPROVEMENT PLAN <br />