My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2. SR 12-20-1999
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1999
>
12/20/1999
>
6.2. SR 12-20-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:28 AM
Creation date
3/11/2005 4:01:43 PM
Metadata
Fields
Template:
City Government
type
SR
date
12/20/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />3. <br /> <br />All utility and street construction plans and specifications as <br />presented by Northern States Power Company for the Facility and <br />servicing streets must be prepared by a Registered Civil Engineer <br />in accordance with directions of and approved by the City Engineer. <br />All building plans and specifications must be approved by the City <br />Building Inspector and Fire Chief. <br />Approval of driveway entrances, if needed, on State and County <br />highways shall be secured from the appropriate agencies and filed <br />with the City Zoning Administrator prior to issuance of any <br />building permit. Street lighting and acceleration and deceleration <br />lanes for Highway 10 at the intersection of 165th Street Avenue <br />and Highway 10 shall be installed by City to provide safe access to <br />Highway 10 for trucks entering and leaving the Facility. Failure by <br />Permittee to reimburse the City for the installation of said <br />improvements within thirty (30) days of receiving an invoice for all <br />or any part of said improvements shall be cause for revocation of <br />this Permit <br />The City shall have the right of access to all areas of the Processing <br />Facility and site for the purpose of inspection to ensure compliance. <br />with all of the terms and conditions of this permit and the Solid <br />Waste Facility License for the Facility. The City need not give prior <br />notice to the Permittee for personnel to access the Processing <br />Facility or site during the normal waste receiving hours of 6 a.m. to <br />6 p.m., Monday through Saturday, or if an explosion or other <br />emergency occurs. At any other time, at least twelve (12) hours <br />prior notice to the Permittee is required. Such access shall be in <br />accordance with reasonable safety standards and reasonable <br />proprietary information requirements. <br /> <br />4. <br /> <br />5. <br /> <br />6. <br /> <br />Alternatively, the City may, in its discretion, upon thirty (30) days <br />notice to Permittee, to further ensure compliance with the <br />restrictions in this Conditional Use Permit and in Section 604 of the <br />City Code of Ordinances on the handling and processing of <br />hazardous and dangerous waste, and to protect the public health, <br />safety, and general welfare of the citizens of Elk River, place full- <br />time City inspectors at the Facility twenty-four (24) hours a day. <br />These inspectors shall have the right of access to all areas of the <br />Facility, twenty-four (24) hours a day, for the purposes of inspection <br />to ensure compliance with all of the terms and conditions of this <br />Conditional Use Permit, the license for the Facility, and Section 604 <br />of the City Code. The on-site City inspector shall have the right, at <br />any time, to take one or more of the following actions: <br /> <br />s: \b&z \stever \exhibita.doc <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.