My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2. SR 12-20-1999
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1999
>
12/20/1999
>
6.2. SR 12-20-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:28 AM
Creation date
3/11/2005 4:01:43 PM
Metadata
Fields
Template:
City Government
type
SR
date
12/20/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />3. The Combined Air and Solid Waste Permit No. 147A-86-0T-1 <br />14100003-001 for an Air Emission Facility, Air Pollution <br />Control Equipment, and Solid Waste Processing System, and <br />Permit for the Construction and Operation of a Waste <br />Processing Facility, No. SW-305 (collectively referred to as the <br />MPCA Permit), issued by the Minnesota Pollution Control <br />Agency (MPCA). <br /> <br />II. <br /> <br />This License is issued subject to the requirements and conditions <br />set forth below in Section III, which are imposed for the purposes <br />of: <br /> <br />1. Satisfying the standards set forth in the Elk River City Code of <br /> <br />Ordinances, including Section 604 and Article IX thereof; <br /> <br />2. Promoting compatibility with and minimizing any potential <br /> <br />adverse effects upon properties and neighborhoods adjacent to <br /> <br />the Facility or within the City; <br /> <br />. <br /> <br />3. Protecting the public health, safety, and general welfare; <br /> <br />4. Avoiding traffic congestion or hazard; and <br /> <br />5. Preventing land, water, or air pollution. <br /> <br />III. Requirements and Conditions: <br /> <br />1. Incorporation of Plans and Avplication Materials. Construction <br />and operation of the Facility shall be in accordance with the <br />plans and other materials submitted by Licensee to the City and <br />the MPCA, including those identified above in Section I of this <br />License, all of which are hereby made a part of this License. <br />Construction or operation in violation of any of the material <br />statements of fact, factual information, or representations made <br />by the Licensee to the City or MPCA shall be deemed to be a <br />violation of this License. <br />2. Submission of Final Plans. Final plans and specifications for <br />the Facility must be reviewed and approved by City staff and/or <br />consultants prior to the issuance of a building permit for the <br />Facility. <br /> <br />. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.