Laserfiche WebLink
Sidewalks..........................................New................................................ 0% <br /> ..........................................................Replacement ................................ 100% <br /> County <br /> Construction Item Type Cost Participation % <br /> Signing/Striping................................. ..................................................... 100% <br /> Storm Sewer <br /> - Main Lines/Manholes/Catch Basins...................................................... 50% <br /> Surfacing - Travel Lanes................... ..................................................... 100% <br /> Surfacing - Parking Lanes................. ....................................................... 0% <br /> Surfacing - Left/Right/CenterTurn Lanes................................................. 100% <br /> Utilities .............................................. <br /> - Sanitary Sewer Modifications......... ....................................................... 0% <br /> - Watermain Modifications................ ....................................................... 0% <br /> - Private Utility Modifications............ ....................................................... 0% <br /> Public Utility Modifications................. ....................................................... 0% <br /> (Other than sanitary sewer and watermain) <br /> Right-of-Way..................................... ....................................................100%u <br /> Federal Cost Sharing ........................All ......................................... Based on the % <br /> .......................................................... ............................................Of Municipal Cost <br /> .......................................................... ............................................. Participationu** <br /> LL*Traffic Signals will be funded only if MnDOT warrants are met and a Signal Justification Report is <br /> approved. Traffic Signals will be funded up to 50%of the local share on County Highways and County <br /> State Aid Highways. Traffic Signals on Trunk Highways will be funded up to 50% of the remaining local <br /> share. The Geunty will nGtCity/Twp shall be responsible for certain maintenance provisions after signal <br /> construction including power costs. <br /> LQ***Federal Cost Sharing Example: If the municipal cost participation items amount to 25% of the project <br /> costs—25% of the Federal Funds may be applied toward the municipal cost participation items that are <br /> eligible for federal funding. <br /> (3) Includes RNV acquisition on road construction projects that contain a bike path or sidewalk. For <br /> standalone trail and sidewalk projects, RNV acquisition would be the responsibility of the agency leading <br /> the project. <br /> County Participation is subject to the availability of funds. <br /> All participation includes construction, preliminary engineering and construction engineering costs. <br />