My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. SR 10-16-2017
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2017
>
10-16-2017
>
4.5. SR 10-16-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2017 8:10:45 AM
Creation date
10/13/2017 8:08:58 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/16/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To:Contact:Regenscheid Custom Homes Justin Moody <br />Trace Heights 2nd AdditionProject Name:Bid Number:17-079 <br />Fax:Ramsey, MN 55303 <br />Address:14000 Sunfish Lake Blvd.Phone: <br />Project Location:Bid Date:6/22/2017 <br />Total PriceUnit PriceUnitItem DescriptionItem #Estimated Quantity <br />$1,060.00$265.004.0015 EACHType III Barricades <br />$1,300.00$325.004.0016 EACHStreet Sign <br />$644,689.50Total Bid Price: <br />Notes: <br />•Addenda Acknowledged: N/A. <br />•Price does not include: Site Surveying; Soil Testing; Building or Structure Demolition; Hidden or Buried Debris; Hazardous Materials Removal; Street <br />Sweeping; Dewatering; Import and/or Export of Dirt; Site Utilities other than those listed above; Bonds and Permits; Moving of Small Utilities; Any <br />Trench Borrow; SWPPP Management/Maintenance; Traffic Control; Silt Fence Removal;Any Erosion Control NOT Listed Above; <br />•Pricing is based on the engineer(s) plans dated: 6/9/17. <br />•Proposal is valid for a period of 30 days from date of proposal. <br />•This proposal assumes an average topsoil depth of 1.0 foot. <br />•Any delays due to incomplete surveying or improper surveying could result in additional charges. <br />•Price does not include lowering/moving small utilities. If there are utilities not properly represented on plans, price is subject to change. <br />•Retainage is NOT to exceed 5% without prior approval, and is to be released/reduced as our work is approved. <br />•**Owner/Developer agrees that NPDES Permit will be transferred back to Owner/Developer, as New Contractor, within 10 days <br />of completion of grading/storm sewer and site is stabilized, with either Erosion Blanket or Seed & Mulch.** <br />Payment Terms: <br />Net due upon receipt of billing. A 1.5% per month service charge will be assessed on unpaid balance. <br />ACCEPTED: <br />The above prices, specifications and conditions are satisfactory <br />and hereby accepted. <br />Buyer: <br />Signature: <br />Date of Acceptance: <br />CONFIRMED: <br />North Pine Aggregate, Inc. <br />Authorized Signature: <br />Estimator:JordanErickson <br />jordan@npainc.net <br />Page 2 of 26/22/2017 6:29:05 PM
The URL can be used to link to this page
Your browser does not support the video tag.