Laserfiche WebLink
PAY ESTIMATE #6 <br />CITY OF ELK RIVER <br />2017 Street Improvements <br />FF LOCAL FINDING. CONTINUED <br />REM <br />NO. <br />REM DESCRIPTION <br />ESTIMATED <br />QUANTITY <br />UNIT <br />CONTRACT <br />UNIT PRICE CONTRACT AMOUNT <br />USED TO <br />DATE <br />EXTENSION <br />61 <br />CONCRETE CURB AND GUTTER DESIGN 8618 <br />2559 <br />LIN FT <br />$12,]9 S <br />32729.61 <br />2401 <br />30708.79 <br />62 <br />6- CONCRETE DRIVEWAY PAVEMENT <br />1,397 <br />SO YD <br />$52.9] S <br />73999.09 <br />1802.6 <br />95483.2 <br />63 <br />T CONCRETE DRIVEWAY PAVEMENT <br />106 <br />SO YD <br />$77.04 a <br />8166.24 <br />94 <br />$ ]241.]6 <br />64 <br />8' CONCRETE DRIVEWAY PAVEMENT <br />73 <br />SQ YD <br />$57.78 It <br />6217.94 <br />RECYCLE CLASS 5 <br />TN <br />65 <br />CONCRETE DRAINAGE FLUME <br />61 <br />SO YD <br />$115.56 a <br />7049.16 <br />50 <br />5778.0 <br />66 <br />TRUNCATED DOMES <br />170 <br />SOFT <br />WAS $ <br />8185.50 <br />88 <br />S 4237.20 <br />67 <br />ISITUMINOUSCURB <br />1.710 <br />LIN FT <br />$2.14 S <br />3659.40 <br />2.461 <br />$ 5266.54 <br />68 <br />MAIMOXSUPPORT <br />15 <br />EACH <br />$101.65 <br />1524.75 <br />$ <br />69 <br />INSTALL MAILBOX SUPPORT <br />106 <br />EACH <br />S42.80 S <br />6451.20 <br />50 <br />3424.00 <br />70 <br />TRAFFIC CONTROL <br />0.44 <br />LUMPSUM <br />$79859.18 a <br />35138.04 <br />0.44 <br />$ 35138.04 <br />71 <br />INSTALL SIGN SUPPORT <br />17 <br />EACH <br />$80.25 <br />1364.25 <br />11 <br />$ 882.75 <br />72 <br />ADJUST HANDHOLE <br />2 <br />EACH <br />$428.00 <br />856.00 <br />73 <br />RIGID PVC LOOP DETECTOR 61& <br />4 <br />EACH <br />$9D9.51 $ <br />3638.04 <br />S <br />74 <br />SILT FENCE TYPE MS <br />2280 <br />LIN FT <br />$1.87 <br />4263.60 <br />4P <br />891.99 <br />75 <br />STORM DRAIN INLET PROTECTION <br />a4 <br />EACH <br />$90.95 S <br />4001.80 <br />44 <br />$ 4D01.80 <br />76 <br />SEDIMENT CONTROL LOG TYPE COMPOST <br />3450 <br />LIN FT <br />$1.87 $ <br />8451.50 <br />2,606 <br />48]3.22 <br />77 <br />STABILIZED CONSTRUCTION EXIT <br />0.44 <br />LUMP SUM <br />$5,200.25 <br />2288.11 <br />$ <br />78 <br />CULVERT END CONTROLS <br />2 <br />EACH <br />$240.76 <br />461.52 <br />S - <br />79 <br />FERTILIZER TYPE I <br />2,173 <br />POUND <br />$1.02 $ <br />2216.46 <br />1,436 <br />1464.72 <br />80 <br />COMMON TOPSOIL BORROW LV <br />1092 <br />CU YD <br />$35.85 $ <br />39148.20 <br />1,657 <br />a 59403.45 <br />81 <br />SEEDING <br />7 <br />ACRE <br />$374.50 <br />2640.23 <br />4.8 <br />S 1797.50 <br />82 <br />SEED MIXTURE 2&131 <br />1.549 <br />POUND <br />$3.20 It <br />4956.80 <br />1,022 <br />3270.40 <br />83 <br />EROSION CONTROL BLANKETS CATEGORY 3 <br />3.125 <br />SO YD <br />S1.56 $ <br />4843.75 <br />604 <br />936.20 <br />84 <br />HYDRAULIC NATURAL TACKIFIER <br />30.922 <br />SO YD <br />$0.75 $ <br />23191.50 <br />20408 <br />$ 15306.00 <br />85 <br />EROSION CONTROL <br />0.44 <br />LUMP SUM <br />$3210.02 S <br />1412.41 1 <br />0.44 <br />1412.41 <br />86 <br />PAVEMENT MESSAGE EPDXY <br />45 <br />SOFT <br />$5.73 $ <br />257.85 <br />45 <br />257.85 <br />87 <br />4' SOLID LINE EPDXY <br />2959 <br />LIN FT <br />$0.31 <br />917.29 <br />5,018 <br />$ 1555.58 <br />88 <br />24' SOLID LINE EPDXY <br />43 <br />LIN FT <br />S6.88 <br />295.84 <br />44 <br />302.2 <br />89 <br />4' BROI(EN LINE EPDXY <br />622 <br />LIN FT <br />$0.31 $ <br />192.82 <br />600 <br />a 188.0 <br />90 <br />4' DOUBLE SOLID LINE EPDXY <br />1,100 <br />LIN FT <br />$0.62 <br />731.60 <br />$ - <br />91 <br />CROSSWALK EPDXY <br />270 <br />SQ FT <br />$3.67 <br />990.9D <br />Total BIB Schedule "F" $ 1.824.%1.43 f 1.729.325.00 <br />G.I DCAL FUNDING FIEI <br />ITEM <br />NO. <br />REM DESCRIPTION <br />ESTIMATED <br />QUANTITYUNIT <br />CONTRACT <br />UNIT PRICE CONTRACT AMOUNT <br />USED TO <br />DATE <br />EXTENSION <br />ON <br />COMMON EXCAVATION <br />CY <br />$27.35 <br />559 <br />15288.65 <br />2 <br />STABILIZING AGGREGATE 1.5'CLEAR ROCK <br />TON <br />$36.52 <br />327.78 <br />11970.53 <br />3 <br />4'DRAIN TILE <br />LF <br />$13.13 <br />513 <br />6735.69 <br />4 <br />GEOTEXTILE FABRIC <br />SY <br />$2.74 - <br />4,563 <br />$ 12502.62 <br />5 <br />GRANULAR BORROW <br />CY <br />$17.70 - <br />994 <br />a 17593.80 <br />e <br />RECYCLE CLASS 5 <br />TN <br />$18.31 <br />121.95 <br />2232.90 <br />III 66.324.19 <br />SAMuricipaMelkrry AERWGIPAY ESTIMATES\ERWG PE PE -7 <br />