Laserfiche WebLink
Appendix A <br /> Zack,the following is what we have learned in putting the proposal together. <br /> Grant Costs <br /> 1. Building Scan with a laser camera to develop initial drawings $ 3,100 to $ 3,100 <br /> 2. Initial Environmental Study $ 3,500 to $ 3,500 <br /> 3. Grant Fees for Architectural Services $ 6,500 to $ 9,000 <br /> Construction Costs <br /> 1. Painting the elevator(CDG estimate adjusted for 5%inflation per year) $73,000 to $98,000 <br /> 2. Steel Repair $ 9,000 to $19,000 <br /> 3. Environmental Testing $25,000 to $40,000 <br /> 4. Environmental removal of lead paint,etc. $39,000 to $80,000 <br /> 5. Misc. $ 8,000 to $12,000 <br /> Construction Soft Costs <br /> 1. Contingency Approx. 10% $16,000 to $20,000 <br /> 2. Owners Costs $ 6,500 to $10,000 <br /> 3. Architectural Engineering Fees estimate(Basic Services) $13,000 to $17,000 <br /> 4. Reimbursable costs $ 500 to $ 1,500 <br /> 5. Engineering costs(estimate) $ 5,000 to $ 5,000 <br /> 6. Testing,permits,etc.(estimate) $ 2,500 to $ 2,500 <br /> Total $210,600 to $320,600 <br /> _____ <br /> ri ; <br /> 4 <br /> Architecture • Interiors • Planning <br /> 89 <br />