My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.6. SR 03-14-2005
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2005
>
03/14/2005
>
5.6. SR 03-14-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:26 AM
Creation date
3/11/2005 8:59:08 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/14/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Potential Future Projects <br />January 31, 2005 <br /> <br />Page 2 <br /> <br />the lead in pushing Sherburne County to study this corridor and identify the future right- <br />of-way needs that could be preservedand/or acquired. <br /> <br />7. Corridor Study for School Street Alignment West to Upland Avenue <br /> <br />Another of the corridors that the Transportation Plan identifies as being needed is from <br />School Street at Proctor Avenue westerly to Upland Avenue. This will provide a route <br />for vehicles wanting to go to the northwest, not having to come down to TH 10 and <br />have a short trip on TH 10 over to Upland. Also in the future as the Inter Regional <br />Corridor improvements are undertaken on TH 10, the movement that is currently made <br />to get to the northwestern part of the City may not be possible. This corridor would <br />primarily go through Cretex Companies property. <br /> <br />8. Tyler Street Corridor Study from CSAH 33 to County Road 21 <br /> <br />This i~ another corridor that the Transportation Plan identifies as being needed. In the <br />future it would provide a north-south route between CSAH 33 and County Road 21, <br />again, to eliminate traffic jumping on TH 169 for short trip. If this corridor were to be <br />identified, it could be likely acquired as this area of the City will be opened up to <br />additional development in the future, according to the Comprehensive Plan. <br /> <br />9. Corridor Study for County Road 21/221 st Avenue <br /> <br />As you are aware, County Road 21 was re~routed down to CSAH 33 as an interim <br />measure when the interchange was constructed at CSAH 33 and TH 169. It has always <br />been anticipated that County Road 21 would ultimately find a route to TH 169 at the <br />intersection of 221st Avenue on the west side ofTH 169. At that point, 221st Avenue, <br />which is a City street, could be turned back to the County and a corridor could be <br />identified at the west end (proctor Avenue) of 221st Avenue westerly to meet CSAH 33. <br />This is again primarily a Sherburne County issue, but as this portion of the City of Elk <br />River develops in the future, it would be good to identify this corridor and preserve the <br />right-of-way. The City could take the lead in identifying these corridors along with <br />County participation. <br />t~ ' ( <br />10. Corridor Study in Central Elk River to connect CSAH,Xwith Tyler Street 1'~ <br /> <br />" <br /> <br />This is another corridor that is identified in the Transportation Plan. This is in an area <br />of the City were there a limited number of east-west corridors. The Transportation Plan <br />identified a need for a corridor in the 197" Avenue area that would conriect CSAH 1 <br />with Tyl~r Street. This would also fit well with the Inter Regional Corridor Plan for TH <br />'169, which anticipates a half-diamond at the 197" Avenue intersection with TH 169. <br /> <br />11. CSAH 1 (proctor Avenue) Expansion Just North of TH 10 <br /> <br />Another project that the Transportation Plan identifies as being needed in the future is <br />the expansion of CSAH 1 (proctor Avenue) just north ofTH 10 to a four-lane divided <br />roadway with protected left turns. To expand to this type of street section would <br />certainly require some additional right-of-way acquisition, and would likely entail the <br /> <br />S:\EngineerImprovProj\200s Improvement Projects\Ol 31 OS Potential future projects.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.