Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Memo to City CounciVZC 99-7, P 99-10, CD 99-30 <br />October 11, 1999 <br />Page 8 <br /> <br />18. A SEALCOAT FEE IN THE AMOUNT TO BE DETERMINED BY THE <br />CITY ENGINEER BE PAID TO THE CITY PRIOR TO RELEASING THE <br />PLAT FOR RECORDING WITH SHERBURNE COUNTY. <br /> <br />19. A LANDSCAPE PLAN SHALL BE PROVIDED PRIOR TO FINAL PLAT. <br />THE LANDSCAPE PLAN SHALL INCLUDE FRONT YARD AND <br />BOULEVARD TREES AND LANDSCAPE SCREENING AS REQUIRED BY <br />ELK RIVER CITY ORDINANCE. <br /> <br />20. THAT A TEMPORARY CUL-DE-SAC IS INSTALLED AT THE NORTH <br />END OF POLK STREET NW IN THE PLAT AND AN EASEMENT BE <br />DEDICATED FOR THE TEMPORARY CU- DE-SAC. <br /> <br />21. MINIMUM SETBACK REQUIREMENTS FOR THE PRINCIPLE <br />STRUCTURE SHALL BE AS FOLLOWS: <br /> <br />FRONT YARD <br />SIDE YARD <br />GARAGE SIDE <br />REAR YARD <br /> <br />35 FEET <br />20 FEET <br />20 FEET <br />30 FEET <br /> <br />22. ACCESSORY STRUCTURE SETBACKS SHALL BE: <br /> <br />FRONT YARD <br />SIDE YARD <br />REAR YARD <br /> <br />35 FEET <br />20 FEET <br />30 FEET <br /> <br />23. THAT WETLAND MITIGATION BE FINALIZED PRIOR TO CITY <br />REVIEW OF THE PRELIMINARY PLAT. <br /> <br />24. THAT AN ADDITIONAL 10 FEET BE ADDED TO THE DRAINAGE AND <br />UTILITY EASEMENTS EAST OF TYLER, WHICH MAY BE USED FOR <br />TRAIL PURPOSES. <br /> <br />25. THAT THE NUMBER OF LOTS BE REDUCED FROM THE REQUESTED <br />27 DOWN TO 24 LOTS. <br /> <br />Staff recommends that the City Council concur with the Planning Commission's <br />recommendation, but strike condition 25. The proposed number of lots is consistent <br />with the surrounding land use. <br /> <br />\ \elkriver\sys \shrdoc \planning\stevewen \ccmmo \p99-10a.doc <br />