Laserfiche WebLink
AN <br />C 0 M P A N I E 5 <br />682 3Y Ane NE Columbia Heights, MN. 55421 <br />Phone (763-780-5191) Fax (763-780-5472) <br />TO: City of Elk River <br />Date: 7/28/2017 <br />FROM: Kyle Higdem Vice -President <br />Cell Phone (612)-490-8111 <br />Email: Kyle@swancompanies.net <br />RE: Project Narrative for <br />Gas Canopy Expansion to Coborns Superstore <br />19425 Evans ST NW, Elk River. MN. <br />Coboms Inc. Is proposing to add a 24 hour pay at the pump fuel <br />canopy at this location. The addition of this facility will benefit the ever <br />growing population of the City of Elk River giving them another convenient <br />option for fueling their vehicles. <br />The Canopy will be a standard metal framed structure with steel roof <br />decking and Painted aluminum decorative fascia. The color will be off white <br />to match the natural colors of the existing building. It will be 114' long, 24' <br />wide parallelogram. It will have four dispenser islands with Stainless steel <br />curbs and protective steel bollards at all corners of the islands. There will be <br />modern flush mounted led lights under the canopy. Company Logo and fuel <br />pricing signage would be provided on the fascia per City of Elk River <br />signage code. Additional permits would be secured at during construction. <br />We are proposing an automotive Vacuum island adjacent to the fuel canopy <br />to the west. This would be a small self -serve vacuum station for the <br />convenience of our customers. We will provide window washing "buckets" <br />attached to the canopy columns as well as trash receptacles at each island. <br />The Canopy structure will be located in an existing overflow parking <br />hard surface area in the South West corner of the lot. This will generate no <br />additional storm run off for the site. The canopy roof drains will discharge to <br />the surface at the base of the canopy upright posts. The water will sheet <br />drain across the parking lot to existing storm structures. <br />We propose relocating a 12" storm sewer line away from the current <br />easement. This would consist of rerouting the line to the North of the <br />Canopy site through a new easement then abandoning the existing easement. <br />