Laserfiche WebLink
PAY ESTIMATE #5 <br />CITY OF ELK RIVER <br />2017 Street Improvements <br />E "E" - SA.P. 204-164001 - EVANS STREET <br />ITEM <br />NO. <br />REM DESCRIPTION <br />ESTIMATED <br />QUANTITY <br />UNIT <br />CONTRACT USED TO <br />UNITPRICE CONTRACT AMOUNT DATE <br />EXTENSION <br />1 <br />MOBILIZATION <br />0.06 <br />LUMPSUM <br />$80,250.83 S <br />4815.05 <br />2 <br />REMOVE CURB AND GUTTER <br />2160 <br />LIN FT <br />$5.20 $ <br />11,232.M <br />$ <br />3 <br />REMOVE CONCRETE PAVEMENT <br />1,412 <br />SOFT <br />$1.46 $ <br />2061.52 <br />4 <br />REMOVE CONCRETE WALK <br />2230 <br />SOFT <br />S1.D9 <br />2430.70 <br />5 <br />REMOVE BITUMINOUS PAVEMENT <br />774 <br />SO VD <br />S4.84 $ <br />3746.16 <br />$ <br />6 <br />SAWING CONCRETE PAVEMENT FULL DEPTH <br />230 <br />LIN FT <br />$3.16 $ <br />726.80 <br />$ <br />] <br />SAWING BITUMINOUS PAVEMENT FULL DEPTH <br />360 <br />LIN FT <br />2.09 <br />752.40 <br />8 <br />SALVAGE SIGN SUPPORT <br />6 <br />EACH <br />37.45 <br />224.70 <br />$ <br />9 <br />SALVAGECASTING <br />11 <br />EACH <br />$107.00 <br />11]1.00 <br />10 <br />MILL BITUMINOUS SURFACE 1.17 <br />1544 <br />SO YD <br />1.95 <br />3010.80 <br />11 <br />MILL BITUMINOUS SURFACE <br />8,330 <br />SO YD <br />$0.59 $ <br />4914.70 <br />$ <br />12 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />883 <br />GALLON <br />$2.51 $ <br />2216.33 <br />13 <br />TYPE SP 9.5 WEARING COURSE MIXTURE 3C <br />1530 <br />TON <br />7.87 <br />73241.10 <br />14 <br />TYPE SP 12.5 BITUMINOUS MIXTURE FOR PATCHING <br />185 <br />TON <br />$59.82 $ <br />11066.70 <br />15 <br />1 ADJUST VALVE BOX <br />5 <br />1 EACH <br />$441.921 $ <br />2209.W <br />16 <br />INSTALL CASTING <br />11 <br />EACH <br />$110.48 <br />1215.28 <br />17 <br />ADJUST FRAME AND RING CASTING <br />2 <br />EACH <br />$994.32 $ <br />1988.64 <br />18 <br />SEAL CATCH BASIN <br />11 <br />EACH <br />$lM.i5 <br />1706.65 <br />19 <br />eCONCRETEWALK <br />1,400 <br />SOFT <br />$6.37 <br />8918.00 <br />$ <br />20 <br />6"CONCRETEWALK <br />870 <br />$0 FT <br />$7.44 $ <br />6472.80 <br />$ <br />21 <br />CONCRETE CURB AND GUTTER DESIGN 8818 <br />2,160 <br />LIN FT <br />$12.79 <br />27626.40 <br />It <br />22 <br />T CONCRETE DRIVEWAY PAVEMENT <br />157 <br />SOYD <br />$77.04 $ <br />12095.28 <br />$ <br />23 <br />TRUNCATED DOMES <br />294 <br />SOFT <br />$48.15 $ <br />14156.10 <br />24 <br />TRAFFIC CONTROL <br />0.06 <br />LUMPSUM <br />$79,859.17 <br />4791.55 <br />25 <br />INSTALL SIGN S UPPORT <br />6 <br />EACH <br />$80.25 S <br />481.50 <br />$ <br />26 <br />STORM DRAIN INLET PROTECTION <br />11 <br />EACH <br />90.95 <br />1,000.,15 <br />27 <br />STABILIZED CONSTRUCTION EXIT <br />0 <br />LUMPSUM <br />$5,200.33 <br />312.02 <br />28 <br />COMMON TOPSOIL BORROW LV <br />30 <br />CU YD <br />$47.06 $ <br />1411.80 <br />29 <br />SEEDING <br />0.15 <br />ACRE <br />374A7 <br />56.17 <br />30 <br />SEED MIXTURE 26131 <br />25 <br />POUND <br />$3.2D $ <br />80.00 <br />$ <br />31 <br />HYDRAULIC NATURAL TACKIFIER <br />533 <br />Sam <br />$0.75 $ <br />399.75 I <br />$ <br />32 <br />EROSION CONTROL <br />0.06 <br />LUMPSUM <br />$3,210.00 <br />192.60 <br />33 <br />PAVEMENT MESSAGE EPDXY <br />71 <br />SO FT <br />$5.73 $ <br />406.83 <br />$ <br />34 <br />4- SOLID LINE EPDXY <br />240 <br />LIN FT <br />$0.31 <br />74.40 <br />35 <br />2W SOLID LINE EPDXY <br />70 <br />LIN FT <br />$6.88 S <br />481.60 <br />$ <br />36 <br />4 BROKEN LINE EPDXY <br />1,150 <br />LIN FT <br />$0.31 $ <br />356.50 <br />$ <br />37 <br />4 DOUBLE SOLID LINE EPDXY <br />2250 <br />LIN FT <br />S0.62 <br />1395.00 <br />38 <br />CROSSWALK EPDXY <br />324 <br />SOFT <br />$3.671$ <br />1189.08 <br />$ <br />Total Bid Sehedole"E" $ 210.633.96 E <br />SAMunicIpaMelkrNer1ER303\PAY ESTIMATES\ER303 PE PE -5 <br />