My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1 ERMUSR 09-12-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2017
>
09-12-2017
>
4.1 ERMUSR 09-12-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2017 3:55:03 PM
Creation date
9/8/2017 3:55:03 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
9/12/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> ERMU Commission Troy Adams,P.E. - General Manager <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> September 12, 2017 4.1 <br /> SUBJECT: <br /> Delegation to Management Policies <br /> ACTION REQUESTED: <br /> Adopt the proposed Delegation to Management Policies. <br /> BACKGROUND: <br /> In 2016 the Commission approved contracting with Collaboration Unlimited to update and <br /> develop core governance policy. The decision to implement and the schedule for completion <br /> were largely based on two factors. First,the existing policy book and by-laws had not been <br /> reviewed or updated on a routine basis. Second, with the March 2017 expansion for the ERMU <br /> Commission from three to five members it was determined to be beneficial to develop and <br /> update core governance policy to serve as a guide for the expanded Commission. <br /> The work was divided into two phases,the first being the core governance policies and the <br /> second addressing the development of delegation to management policies. <br /> DISCUSSION: <br /> Presented for consideration are the next four delegation to management policies that our <br /> consultant John Miner has developed. Staff worked with ERMU's legal counsel to review the <br /> proposed delegation to management policies. The results of that review are reflected in the ° <br /> following proposed policies: <br /> • G.4k MMPA Relationship, Representation, and Governance <br /> • G.41 Protection of Assets <br /> • G.4m Corporate Risk Management <br /> • G.4n Legal and Regulatory Compliance <br /> With only the first fifteen policies of Phase 2 developed,there are gaps and overlap in policy. <br /> These gaps and overlaps are intended to be resolved as the Commission reviews and considers <br /> policy updates and revisions throughout this project. It is the intention to bring policy back for <br /> consideration at every Commission meeting. The remaining policies to be developed in the <br /> delegation to management are reflected in the tentative table of contents which is attached for <br /> reference. <br /> Additionally,the proposed policies on Protection of Assets and Corporate Risk Management <br /> included significant"new work."Most of the policies that have been adopted through this <br /> process either document existing practices or define overarching policy consistent with existing <br /> Page 1 of 2 <br /> 46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.