Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />09/10/99 09:05 FAX <br /> <br />14]03 <br /> <br />Neal Krzy7.11ni:ddBridgeland Development <br />Page Two <br />September 2, 1999 <br /> <br />Based on my field observations, careful drain field placement will be essential on <br />Block 3, ~n order to avoid placing the drain field in areas subject to ponding. <br /> <br />Please contact Eco Systems at 441-7509 if you have any questions or require fwther <br />infonnation. <br /> <br /> <br />-~ <br /> <br />Enclosures: 16 <br /> <br />cc w/enclosures: Peter Knaeble, Terra Engineering, 600 I Glenwood, Mpls. 55422 <br /> <br />cc w/out enclosures: Steve Rohlf, City of Elk River, 13065 Orono Road, Elk River <br />55330 <br /> <br />, <br />( <br />