My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. SR 09-20-1999
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1999
>
09/20/1999
>
4.5. SR 09-20-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:23 AM
Creation date
3/7/2005 3:57:54 PM
Metadata
Fields
Template:
City Government
type
SR
date
9/20/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />rCI ---'\) <br />( ); <br />~l}{ <br /> <br />ITEM #4.5. <br /> <br /> <br />MEMORANDUM <br /> <br />FROM: <br /> <br />Mayor & City Council <br /> <br />Pat Klaers, City Ad~Qator <br /> <br />September 20, 1999 ~ <br /> <br />DATE: <br /> <br />SUBJECT: City Engineer Update on Improvement <br />Projects <br /> <br />City Engineer Terry Maurer will be in attendance at this September 20, 1999, City <br />Council meeting and is scheduled to provide everyone with an update on current <br />and planned improvement projects. <br /> <br />. <br /> <br />At the last City Council meeting on September 13, 1999, the council requested an <br />update on the status of residential wells in and around the East Elk River <br />Improvement Project, as a public comment was received on this situation. In <br />addition to responding to this issue, Terry should be able to advise us on how the <br />overall installation of the trunk utility system is going and the status of the street <br />and storm sewer project. The street and storm sewer project is currently moving <br />through the MnDOT approval process and hopefully will be bid out late this fall so <br />that some construction can begin before the end of the year. <br /> <br />Another major project in 1999 was the School Street expansion project from two <br />lanes to four lanes from Jackson Avenue to Proctor Avenue. This project was under <br />construction during the summer months, and was completed prior to the beginning <br />of the school year. The Police Department is monitoring traffic flow and activities <br />on School Street, especially during the peak morning and afternoon times, and to <br />date no significant problems have been observed. <br /> <br />A third major project in 1999 is the Highway 169 Pedestrian Bridge. This project is <br />currently under construction and substantial completion is expected before winter. <br /> <br />On a different topic, the City Engineer has been talking with the County regarding <br />planned 2000 projects. One of the most pressing projects to be considered is the <br />signalization of the County Roads 1 and 77 intersection, and we are optimistic that <br />this project will move forward quickly in 2000. On the other hand, the status of <br />County Road 12 moving forward in 2000 is dependent upon the acquisition of right- <br />of-way, and the timing of this is uncertain. Associated with the County Road 12 <br />project is the city 175th project, and we are moving forward (using Evergreen Land <br />Services) with the acquisition of the right-of-way for this street and drainage <br />improvement project. <br /> <br />. <br /> <br />Finally, staff has been working with the property owner on the layout of Business <br />Center Drive in anticipation of this extension to Waco being ordered in either 2000 <br />or 2001. <br /> <br />13065 Orono Parkway · P.O. Box 490. Elk River, MN 55330. TDD & Phone: (612) 441-7420. Fax: (612) 441-7425 <br />
The URL can be used to link to this page
Your browser does not support the video tag.