Laserfiche WebLink
Date: 1-Aug-17 <br />Low High <br />I. Site Acquisition <br />Preferred Site $0 $0 <br />Other Sites <br />Sub Total $0 $0 <br />II. Site Development 15%20% <br />Utility Extensions $0 $0 <br />Unsuitable Soils/Rock Removal $0 $0 <br />Natural Gas Extensions $0 $0 <br />Storm Water $0 $0 <br />Site Improvements (hardscape)5%-10% of building costs $158,836 $336,638 <br />Sub Total $158,836 $336,638 <br />III. Building Construction Costs Size Cost/SF <br />RS Means (20165)14,677 $196.66 $2,886,381 <br />Five Bugles Historic (2016/17)14,677 $185.40 $2,721,118 <br />Cold Storage 3,000 $151.87 $455,610 $480,000 <br />Sub Total $3,176,728 $3,366,381 <br />IV. Furniture Fixtures and Equipment <br />FF&E $25,000 $35,000 <br />Specific Equipment by Owner $0 $0 <br />Others $0 $0 <br />Sub Total $25,000 $35,000 <br />V. Communications and Technology <br />Technology $15,000 $20,000 <br />Communications $0 $0 <br />Audio Visual Equipment $0 $0 <br />Sub Total $15,000 $20,000 <br />VI. Contingencies, Inflation and Other Costs <br />Inflation to mid-point of construction $178,905 $187,901 <br />Owners Contingency $355,447 $394,592 <br />Sub Total $534,352 $582,493 <br />VI. Professional Fees and Legal <br />Architectural/Engineering $409,268 $450,962 <br />Geotechnical Studies $15,000 $25,000 <br />Commissioning $0 $0 <br />LEED/Sustainability $0 $0 <br />Hazardous Materials $0 $0 <br />Testing and Inspections $15,000 $25,000 <br />Legal $80,918 $136,855 <br />Sub-Total $520,186 $637,818 <br />TOTALS $4,430,102.33 $4,978,329.99 <br />10% of total construction costs Unforeseen Conditions, Owner Changes, E&O <br />12% of Construction Costs <br />2.5-4% of Costs <br />Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com <br />Cost of borrowing, Att. Fees, etc. <br />Allowance <br />Allowance <br />Allowance <br />3%-5% total construction cost <br />Data systems, backbone, patch panels <br />Radio, Tower, Repeaters, Etc. <br />Assume spring of 2018 construction start <br />Assumes mostly new <br />SCBA, Exercise, vehicle exhaust <br />Building Only <br />Building Only <br />Tempered construction <br />Typical hardscape <br />Elk River, MN <br />Potential Costs <br />Remarks <br />Elk River Fire Department - Regional Training Center <br />83