Date: 2-Feb-17 <br />Low High <br />I. Site Acquisition <br />Preferred Site $0 $0 <br />Other Sites <br />Sub Total $0 $0 <br />II. Site Development 15%20% <br />Utility Extensions $0 $0 <br />Unsuitable Soils/Rock Removal $0 $0 <br />Natural Gas Extensions $0 $0 <br />Storm Water $0 $0 <br />Site Improvements (hardscape)5%-10% of building costs $111,175 $244,585 <br />Sub Total $111,175 $244,585 <br />III. Building Construction Costs Size Cost/SF (Plus 10%) <br />New Construction 5,980 $175.00 $1,046,500 $1,151,150.0 <br />Major Renovations 1,745 $120.00 $209,400 $230,340 <br />Minor Renovations 12,095 $80.00 $967,600 $1,064,360 <br />Cold Storage 0 $151.87 $0 $0 <br />Sub Total $2,223,500 $2,445,850 <br />IV. Furniture Fixtures and Equipment <br />FF&E $35,000 $50,000 <br />Specific Equipment by Owner $0 $0 <br />Others $0 $0 <br />Sub Total $35,000 $50,000 <br />V. Communications and Technology <br />Technology $15,000 $20,000 <br />Communications $0 $0 <br />Audio Visual Equipment $0 $0 <br />Sub Total $15,000 $20,000 <br />VI. Contingencies, Inflation and Other Costs <br />Inflation to mid-point of construction $126,388 $138,022 <br />Owners Contingency $251,106 $289,846 <br />Sub Total $377,494 $427,867 <br />VI. Professional Fees and Legal <br />Architectural/Engineering $170,427 $248,439 <br />Geotechnical Studies $15,000 $25,000 <br />Commissioning $0 $0 <br />LEED/Sustainability $0 $0 <br />Hazardous Materials $0 $0 <br />Testing and Inspections $15,000 $25,000 <br />Legal $57,338 $100,634 <br />Sub-Total $257,765 $399,073 <br />TOTALS $3,019,933.80 $3,587,375.58 <br />Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com <br />2.5-4% of Costs Cost of borrowing, Att. Fees, etc. <br />Allowance Data systems, backbone, patch panels <br />Allowance <br />3%-5% total construction cost Assume spring of 2018 construction start <br />10% of total construction costs Unforeseen Conditions, Owner Changes, E&O <br />7-9% of Construction Costs <br />Radio, Tower, Repeaters, Etc. <br />Tempered construction <br />Allowance Assumes mostly new <br />Typical hardscape <br />Building Only <br />Project: Elk River Fire Department - Public Safety Building Fire Station No.2 <br />Location: Elk River, MN <br />Potential Costs <br />Remarks <br />76