Date: 1-Aug-17 <br />Low High <br />I. Site Acquisition <br />Preferred Site $0 $0 <br />Other Sites <br />Sub Total $0 $0 <br />II. Site Development 15%20% <br />Utility Extensions $0 $0 <br />Unsuitable Soils/Rock Removal $0 $0 <br />Natural Gas Extensions $0 $0 <br />Storm Water $0 $0 <br />Site Improvements (hardscape)15%-20% of building costs $757,615 $1,071,131 <br />Sub Total $757,615 $1,071,131 <br />III. Building Construction Costs Size Cost/SF <br />RS Means (20165)25,850 $196.66 $5,083,656 <br />Five Bugles Historic (2016/17)25,850 $185.40 $4,792,585 <br />Cold Storage 1,700 $151.87 $258,179 $272,000 <br />Sub Total $5,050,764 $5,355,656 <br />IV. Furniture Fixtures and Equipment <br />FF&E $101,015 $214,226 <br />Specific Equipment by Owner $0 $0 <br />Others $0 $0 <br />Sub Total $101,015 $214,226 <br />V. Communications and Technology <br />Technology $101,015 $214,226 <br />Communications $0 $0 <br />Audio Visual Equipment $0 $0 <br />Sub Total $101,015 $214,226 <br />VI. Contingencies, Inflation and Other Costs <br />Inflation to mid-point of construction $318,552 $342,762 <br />Owners Contingency $316,448 $359,900 <br />Sub Total $635,000 $702,662 <br />VI. Professional Fees and Legal <br />Architectural/Engineering $435,725 $616,972 <br />Geotechnical Studies $15,000 $25,000 <br />Commissioning $0 $0 <br />LEED/Sustainability $0 $0 <br />Hazardous Materials $0 $0 <br />Testing and Inspections $15,000 $25,000 <br />Legal $136,676 $231,364 <br />Sub-Total $602,400 $898,336 <br />TOTALS $7,247,809.41 $8,456,237.79 <br />5% of total construction costs Unforeseen Conditions, Owner Changes, E&O <br />7-9% of Construction Costs <br />2.5-4% of Costs <br />Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com <br />Cost of borrowing, Att. Fees, etc. <br />2-4% of Building Construction <br />2-4% of Building Construction <br />Allowance <br />3%-5% total construction cost <br />Data systems, backbone, patch panels <br />Radio, Tower, Repeaters, Etc. <br />Assume spring of 2018 construction start <br />Assumes mostly new <br />SCBA, Exercise, vehicle exhaust <br />Building Only <br />Building Only <br />Tempered construction <br />Typical hardscape <br />Location: Elk River, MN <br />Potential Costs <br />Remarks <br />Project: Elk River Fire Department - New Northwest Station <br />74