Date: 1-Aug-17 <br />Low High <br />I. Site Acquisition <br />Preferred Site $0 $0 <br />Other Sites <br />Sub Total $0 $0 <br />II. Site Development 15%20% <br />Utility Extensions $0 $0 <br />Unsuitable Soils/Rock Removal $0 $0 <br />Natural Gas Extensions $0 $0 <br />Storm Water $0 $0 <br />Site Improvements (hardscape)15%-20% of building costs $487,222 $689,084 <br />Sub Total $487,222 $689,084 <br />III. Building Construction Costs Size Cost/SF <br />RS Means (20165)17,520 $196.66 $3,445,419 <br />Five Bugles Historic (2016/17)17,520 $185.40 $3,248,148 <br />Cold Storage 0 $151.87 $0 $0 <br />Sub Total $3,248,148 $3,445,419 <br />IV. Furniture Fixtures and Equipment <br />FF&E $97,444 $172,271 <br />Specific Equipment by Owner $0 $0 <br />Others $0 $0 <br />Sub Total $97,444 $172,271 <br />V. Communications and Technology <br />Technology $97,444 $172,271 <br />Communications $0 $0 <br />Audio Visual Equipment $0 $0 <br />Sub Total $97,444 $172,271 <br />VI. Contingencies, Inflation and Other Costs <br />Inflation to mid-point of construction $208,304 $223,952 <br />Owners Contingency $206,928 $235,150 <br />Sub Total $415,232 $459,102 <br />VI. Professional Fees and Legal <br />Architectural/Engineering $287,177 $403,114 <br />Geotechnical Studies $15,000 $25,000 <br />Commissioning $0 $0 <br />LEED/Sustainability $0 $0 <br />Hazardous Materials $0 $0 <br />Testing and Inspections $15,000 $25,000 <br />Legal $90,383 $151,598 <br />Sub-Total $407,560 $604,713 <br />TOTALS $4,753,050.38 $5,542,859.70 <br />Location: Elk River, MN <br />Potential Costs <br />Remarks <br />Project: Elk River Fire Department - East Station/Otsego <br />Typical hardscape <br />Assume spring of 2018 construction start <br />Assumes mostly new <br />SCBA, Exercise, vehicle exhaust <br />Building Only <br />Building Only <br />Tempered construction <br />3-5% of Building Construction <br />3-5% of Building Construction <br />Allowance <br />3%-5% total construction cost <br />Data systems, backbone, patch panels <br />Radio, Tower, Repeaters, Etc. <br />5% of total construction costs Unforeseen Conditions, Owner Changes, E&O <br />7-9% of Construction Costs <br />2.5-4% of Costs <br />Building D04, Suite 202| 800 Wisconsin St, Mailbox 2 | Eau Claire, WI 54703 | 715.832.4848 | fivebuglesdesign.com <br />Cost of borrowing, Att. Fees, etc. <br />65